Press ReleaseSource: Forsys Metals Corp.

Forsys Continues Drilling at Valencia Expanding Pit Bottom and Overall Resource
Tuesday July 22, 2008 9:15 am ET

TORONTO, ONTARIO--(MARKET WIRE)--Jul 22, 2008 -- Forsys Metals Corp ("Forsys" or the "Company") (Toronto:FSY.TO - News)(Frankfurt:F2T.F - News)(NSX: FSY) is pleased to announce the third set of percussion drilling results from the 2008 exploration campaign at the Company's 100% owned Valencia Uranium Deposit ("Valencia") located in Namibia, Africa. Drilling results demonstrate that the ore body footprint at 325 m depth (380 m elevation) indicates a possible east-west extension of 200 m wide by approximately 500 m long in the north-south direction, as compared to the current pit bottom which is 45 m wide by 75 m long (June 2007 NI 43-101 Technical Report).

Drilling at the Valencia Southwest Zone and Transition Zone has again confirmed additional mineralization further expanding the Valencia resource. The third set of drill hole results in the Southwest Zone and Transition Zone consisted of 13 additional vertical holes, bringing the total to 43 holes (15,050 m). It is notable that all holes in this drilling campaign have exhibited uranium mineralization. Upon completion of the drilling campaign, the Company is expected to deliver a revised reserve and resource calculation in September 2008 along with major components of the feasibility study.

Results from drill holes PD-021 and PD-027 through to PD-030, which were pending from the second set of drill results announced in the Company's news release dated June 13, 2008, are added to the following table of significant intersections. Refer to the Company's website at www.forsysmetals.com for the complete set of results to date from the 2008 exploration campaign.

 

                  Table 1: Southwest Zone Highlights
------------------------------------------------------------------------
                                                              Grade
Hole          From(m)      To(m)    Interval(m)         (Kg/T eU3O8)(i)
------------------------------------------------------------------------
PD-021        168.90     286.40         117.50                0.255
Including     190.10     282.20          92.10                0.293

              308.30     345.80          37.50                0.216
Including     316.80     344.70          27.90                0.248
------------------------------------------------------------------------
PD-027        274.70     295.30          20.60                0.178
Including     274.70     292.90          18.20                0.193
              297.40     336.80          39.40                0.157
Including     298.50     314.90          16.40                0.220
------------------------------------------------------------------------
PD-028        280.70     350.00          69.30                0.132
Including     320.90     349.40          28.50                0.157
------------------------------------------------------------------------


------------------------------------------------------------------------
                                                              Grade
Hole          From(m)      To(m)    Interval(m)         (Kg/T eU3O8)(i)
------------------------------------------------------------------------
PD-029        159.70     178.10          18.40                0.151
              199.30     237.10          37.80                0.191
Including     216.10     236.90          20.80                0.231
              253.10     297.50          44.40                0.152
Including     269.60     282.80          13.20                0.262
              300.20     358.10          57.90                0.170
Including     300.50     307.20           6.70                0.231
Including     343.90     356.60          12.70                0.238
------------------------------------------------------------------------
PD-030        141.90     300.50         158.60                0.199
Including     198.20     236.90          38.70                0.215
Including     264.90     275.50          10.60                0.198
Including     276.60     300.10          23.50                0.248
              302.40     337.20          34.80                0.147
Including     306.70     309.10           2.40                0.188
Including     316.30     321.70           5.40                0.358
------------------------------------------------------------------------
PD-032        141.70     191.40          49.70                0.153
Including     145.90     150.20           4.30                0.179
Including     152.30     157.00           4.70                0.166
Including     181.00     190.40           9.40                0.287
              307.30     338.30          31.00                0.177
Including     307.30     310.70           3.40                0.266
Including     313.90     319.10           5.20                0.207
Including     323.00     334.40          11.40                0.223
------------------------------------------------------------------------
PD-034        169.90     190.40          20.50                0.190
Including     170.30     183.70          13.40                0.229
              213.40     350.00         136.60                0.197
Including     200.30     210.40          10.10                0.246
Including     220.30     227.60           7.30                0.480
Including     229.20     233.10           3.90                0.448
              240.40     277.50          37.10                0.211
Including     283.30     290.20           6.90                0.430
              314.00     334.40          20.40                0.202
Including     314.00     322.20           8.20                0.315
              336.00     350.00          14.00                0.180
------------------------------------------------------------------------
PD-036         51.30      55.70           4.40                0.131
              149.10     156.80           7.70                0.175
              193.90     243.90          50.00                0.116
Including     232.40     243.50          11.10                0.162
------------------------------------------------------------------------
PD-037         28.50      70.50          42.00                0.244
Including      40.70      53.80          13.10                0.322
Including      54.40      60.40           6.00                0.285
Including      61.50      67.90           6.40                0.355
              181.00     309.00         128.00                0.214
Including     185.70     203.40          17.70                0.274
Including     224.80     250.30          25.50                0.268
Including     252.10     259.00           6.90                0.280
              309.90     354.10          44.20                0.141


------------------------------------------------------------------------



------------------------------------------------------------------------
                                                              Grade
Hole          From(m)      To(m)    Interval(m)         (Kg/T eU3O8)(i)
------------------------------------------------------------------------
PD-038         23.50      60.00          36.50                0.277
Including      34.00      45.00          11.00                0.346
Including      54.50      59.90           5.40                0.363
              156.10     173.90          17.80                0.223
Including     156.10     157.50           1.40                0.377
Including     165.90     173.90           8.00                0.317
              199.70     210.80          11.10                0.245
Including     201.20     208.30           7.10                0.329
              228.00     259.60          31.60                0.230
Including     228.30     237.20           8.90                0.285
Including     247.80     257.80          10.00                0.254
              264.30     323.00          58.70                0.156
------------------------------------------------------------------------
PD-041          9.10      66.10          57.00                0.273
               67.50     128.30          60.80                0.199
Including     109.20     123.60          14.40                0.372
              131.10     173.80          42.70                0.215
Including     131.30     144.00          12.70                0.278
              183.30     286.10         102.80                0.171
Including     183.30     194.60          11.30                0.240
Including     250.10     256.60           6.50                0.243
Including     260.20     285.00          24.80                0.203
------------------------------------------------------------------------
PD-046        108.00     271.20         163.20                0.145
Including     163.20     194.60          31.40                0.166
Including     194.60     206.00          11.40                0.195
Including     224.00     265.40          41.40                0.150
              281.40     317.00          35.60                0.149
Including     291.00     315.20          24.20                0.167
              318.90     346.30          27.40                0.202
Including     324.30     341.50          17.20                0.235
------------------------------------------------------------------------
PD-048        179.50     195.20          15.70                0.154
              210.60     228.10          17.50                0.184
Including     210.60     220.10           9.50                0.257
              246.70     350.00         103.30                0.152
Including     290.90     307.90          17.00                0.228
Including     313.80     316.70           2.90                0.291
Including     341.20     350.00           8.80                0.209
------------------------------------------------------------------------




                  Table 2: Transition Zone Highlights
------------------------------------------------------------------------
                                                              Grade
Hole          From(m)      To(m)    Interval(m)         (Kg/T eU3O8)(i)
------------------------------------------------------------------------
PD-035         54.00      65.50          11.50                0.194
               83.90      92.80           8.90                0.199
------------------------------------------------------------------------
PD-040         17.60       98.6          81.00                0.221
Including      64.90      71.70           6.80                0.342
Including      82.50      96.60          14.10                0.268
               99.10      207.4          108.3                0.134
Including      187.1      205.3           18.2                0.247
              269.00      275.7           6.70                0.203
------------------------------------------------------------------------
PD-043        194.90     205.50          10.60                0.181
------------------------------------------------------------------------
PD-051         32.00      71.30          39.30                0.206
Including      32.00      47.40          15.40                0.245
Including      58.60      70.50          11.90                0.242
               71.50     182.50         111.00                0.137
Including     114.70     133.20          18.50                0.185
Including     141.00     150.90           9.90                0.231
Including     158.90     165.00           6.10                0.207
Including     165.70     178.80          13.10                0.211
------------------------------------------------------------------------

(i)The results in this news release are reported as equivalent U308
("eU308"). The Company has calculated a correlation between grade
thickness product of gamma counts (counts per second) collected by down
hole geophysical methods and the grade thickness product of chemical assays
from the Company's drill hole library (otherwise known as GT Chem and
GT Rad). That correlation has been established with over 100 GT intervals
and is used to calculate eU308 in the percussion drill holes from gamma
probe survey with a resulting correlation coefficient of 0.99 (estimation
of confidence level).

To view Figure 1 - Schematic Plan View of Pit Surface, please visit the following link:

http://media3.marketwire.com/docs/fsy722.pdf

Dr. Roger Laine, Chief Geologist of Forsys, is the designated Qualified Person responsible for all of Forsys' exploration programs as well as the person responsible for the contents of this news release.

On Behalf of the Board of Directors of Forsys Metals Corp

Duane Parnham, President and CEO

For further information visit our website at www.forsysmetals.com.

Sedar Profile #00008536

Forward-Looking Information

This press release contains "forward-looking information" including statements and information regarding exploration results. Such forward-looking information reflects the current expectations or beliefs of the Company. Forward-looking information is subject to a number of risks, assumptions and uncertainties that may cause the actual results of the Company to differ materially from those discussed herein, including the possibility that future exploration results will not be consistent with the announced results or the Company's expectations, the resource/reserve and grade of the ore body may not be upgraded, the uncertainties involved in interpreting exploration results and other inherent risks in the mineral exploration and development industry. Such forward-looking information speaks only as of the date on which it is made and, unless required by applicable securities laws, the Company undertakes no obligation to update any forward-looking information, whether as a result of new information, future events or results or otherwise.

Shares Outstanding: 77,085,231



The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.


Contact:
     Contacts:
     Forsys Metals Corp.
     Bruce Hall
     Chief Communications Officer
     (905) 844-4646
     Email: bhall@forsysmetals.com
      
     In Namibia
     Forsys Metals Corp.
     +264 61 219 462
     Email: wrn@forsysmetals.com
     Website: http://www.forsysmetals.com
      

Source: Forsys Metals Corp.


Mail to Friend Email Story
Alerts Set News Alert
Printer
Version  Print Story 


Copyright © 2009 Yahoo! Inc. All rights reserved. Privacy Policy - Terms of Service
Copyright © 2009 Marketwire. All rights reserved. All the news releases provided by Marketwire are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.