|
| |||||||||||||||
Chapleau Commences a 70.7 Line km Ground IP Survey in Preparation for the 7,000 m Phase 3 Drill Program CRANBROOK, BRITISH COLUMBIA--(MARKET WIRE)--Jul 8, 2008 -- Chapleau Resources Ltd. (CDNX:CHI.V - News) has commenced a 70.7
line km IP (induced polarization) dipole-dipole, geophysical
survey over approximately 7.0 km of gold-bearing structures
at Coringa (see maps on website www.chapleauresources.com).
This geophysical survey will be used to better define drill
targets being planned for the 7,000 m, third phase diamond
drill program to commence in August 2008.
The 7,000 m diamond drill program will be done with two drill rigs and will target: 1. Extensions of gold mineralization along the Guaxebinha-Meio-Onca structure that has a strike length of 1,120 m. Limited drilling (4 drill holes) in the Meio zone has identified high grade gold over an area of 200 m. Previous drill results included: - Hole 62 with 3.0 m of 65.77 g/t (1.92 oz/t) Au, 65.17 g/t (1.90 oz/t) Ag, 6.03 % Pb, 4.35 % Zn and 0.45 % Cu from 56 to 59 m. - Hole 11 (This hole was drilled approximately 50 m northwest of hole 62) with 2.0 m of 23.67 g/t Au, 28.25 g/t Ag and 1.67 % Pb from 50 to 52 m). - Hole 65 with 5.0 m of 3.57 g/t Au, 28.73 g/t Ag, 2.23 % Pb, 1.91 % Zn and 0.25 % Cu from 113.5 to 118.5 m. This hole was drilled approximately 33 m northeast of Hole 62. 2. Gold mineralization below 150 m depth on the Serra structure which had the following best drill intercepts highlighted in the table below and previously reported in press releases on website www.chapleauresources.com.
Summary Table of Best Drill Intercepts - Serra Structure
----------------------------------------------------------------------------
Drill Hole ID FROM TO WIDTH (m) Au_(g/t)
----------------------------------------------------------------------------
BR_COR_DDH1 33.00 34.50 1.5 29.31
----------------------------------------------------------------------------
BR_COR_DDH41 60.50 62.00 1.5 14.82
----------------------------------------------------------------------------
BR_COR_DDH42 38.00 39.50 1.5 22.47
----------------------------------------------------------------------------
BR_COR_DDH57 97.00 98.50 1.5 16.08
----------------------------------------------------------------------------
BR_COR_DDH61 98.50 100.00 1.5 15.97
----------------------------------------------------------------------------
BR_COR_DDH38 36.20 37.80 1.6 9.08
----------------------------------------------------------------------------
BR_COR_DDH57 97.00 98.50 1.5 16.08
----------------------------------------------------------------------------This press release was prepared by Ian Gendall, Pr. Sci. Nat., a qualified person in compliance with National Instrument 43-101. For technical information regarding this press release, kindly contact Ian Gendall at 604 669 8511. BY ORDER OF THE BOARD OF DIRECTORS CHAPLEAU RESOURCES LTD., Ian Gendall/President
Contact: Contacts:
Chapleau Resources Ltd.
Ian Gendall
President
(604) 669-8511
(604) 669-7712 (FAX)
Email: info@chapleauresources.com
Website: http://www.chapleauresources.com
Source: Chapleau Resources Ltd.
| |||||||||||||||