|
| ||||||||||||||
Global Finishing, Inc. Drill Program Results From the Second Hole at Joe Mann Mine QUEBEC CITY, QUEBEC--(MARKET WIRE)--Dec 17, 2007 -- Global Finishing, Inc. (Frankfurt:G8BA.F - News) is pleased to report
the preliminary results of its second hole drilled below
the 1,150-metre level of the Joe Mann mine, to further assess
the strike length of the zone encountered in the first drill
hole EE - 188 The second hole drilled (EE-189 B) has been completed last Friday. It intersected one zone at 174.9 m vertical depth below the 1,150-metre mine level and 148.5 m east of the first strike (EE188), with a core length of 1.81 m and assayed 21.1 grams per tonne gold (uncut assay by atomic absorption), 0.44 per cent copper and 22.9 grams per tonne silver. Complete results from the second hole are expected shortly A third hole has been started and is aiming at verifying if the mineralized structure encountered in the first and second hole still horizontally expand further east. The true width of the core has not yet been determined. All assay work was done in house at the mine site with recheck assays to be done by an outside lab. The company will retain the services of Geostat to undertake the following scope of work: 1. Review of all existing information report, maps and database . 2. Site visit and review of the diamond drilling program underway. 3. Estimation of the resources and preparation of the NI 43-101 compliant technical report. Due to the large volume of data to be reviewed the report is expected to be received by the end of March 2008. We seek Safe Harbor. Contact: Contacts:
Global Finishing, Inc.
Richard Diotte, President
418-527-3362
GFML@email.com
http://www.globalfinishinginc.com
Source: Global Finishing Inc.
| ||||||||||||||