Item 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The information required by this item is contained herein, as follows:

Registrants Page No.

Pepco Holdings 135

Pepco 174

DPL 183

ACE 193


Table of Contents

PEPCO HOLDINGS

MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Pepco Holdings, Inc.

General Overview

PHI, a Delaware corporation incorporated in 2001, is a holding company that, through its regulated public utility subsidiaries, is engaged primarily in the transmission, distribution and default supply of electricity, and, to a lesser extent, the distribution and supply of natural gas (Power Delivery). Through Pepco Energy Services, Inc. and its subsidiaries (collectively, Pepco Energy Services), PHI provides energy savings performance contracting services, underground transmission and distribution construction and maintenance services and steam and chilled water under long-term contracts. For additional discussion, see "Pepco Energy Services" below.

Each of Power Delivery and Pepco Energy Services constitutes a separate segment for financial reporting purposes. Through its wholly-owned subsidiary Potomac Capital Investment Corporation (PCI), PHI maintained a portfolio of cross-border energy lease investments. PHI completed the termination of its interests in its cross-border energy lease investments during 2013. As a result, the cross-border energy lease investments, which comprised substantially all of the operations of the Other Non-Regulated segment, are being accounted for as discontinued operations. The remaining operations of the Other Non-Regulated segment, which no longer meet the definition of a separate segment for financial reporting purposes, are being included in Corporate and Other.

The following table sets forth the percentage contributions to consolidated operating revenue and operating income from continuing operations attributable to PHI segments for the three and six months ended June 30, 2014 and 2013:

                                                      Three Months Ended                Six Months Ended
                                                           June 30,                         June 30,
                                                     2014             2013            2014             2013

Percentage of Consolidated Operating Revenue

Power Delivery                                           93 %            96 %             94 %            95 %
Pepco Energy Services                                     7 %             5 %              6 %             5 %
Corporate and Other                                      -               (1 )%            -               -

Percentage of Consolidated Operating Income
Power Delivery                                          105 %            97 %            101 %            95 %
Pepco Energy Services                                     1 %             1 %              1 %             2 %
Corporate and Other                                      (6 )%            2 %             (2 )%            3 %

Percentage of Power Delivery Operating Revenue
Power Delivery Electric                                  97 %            97 %             95 %            95 %
Power Delivery Gas                                        3 %             3 %              5 %             5 %


Table of Contents

PEPCO HOLDINGS

Agreement and Plan of Merger

PHI has entered into an Agreement and Plan of Merger, dated April 29, 2014, as amended and restated July 18, 2014 (the Merger Agreement), with Exelon and Purple Acquisition Corp., a Delaware corporation and an indirect, wholly-owned subsidiary of Exelon (Merger Sub), providing for the Merger, with PHI surviving the Merger as an indirect, wholly-owned subsidiary of Exelon. Pursuant to the Merger Agreement, at the effective time of the Merger, each outstanding share of common stock, par value $0.01 per share, of PHI (other than (i) shares owned by Exelon, Merger Sub or any other direct or indirect wholly-owned subsidiary of Exelon and shares owned by PHI or any direct or indirect wholly-owned subsidiary of PHI, and in each case not held on behalf of third parties (but not including shares held by PHI in any rabbi trust or similar arrangement in respect of any compensation plan or arrangement) and (ii) shares that are owned by stockholders who have perfected and not withdrawn a demand for appraisal rights pursuant to Delaware law), will be canceled and converted into the right to receive $27.25 in cash, without interest.

In connection with entering into the Merger Agreement, PHI entered into a Subscription Agreement, dated April 29, 2014 (the Subscription Agreement), with Exelon, pursuant to which on April 30, 2014, PHI issued to Exelon 9,000 originally issued shares of non-voting, non-convertible and non-transferable Series A preferred stock, par value $0.01 per share (the Preferred Stock), for a purchase price of $90 million. Exelon also committed pursuant to the Subscription Agreement to purchase 1,800 originally issued shares of Preferred Stock for a purchase price of $18 million at the end of each 90-day period following the date of the Subscription Agreement until the Merger closes or is terminated, up to a maximum of 18,000 shares of Preferred Stock for a maximum aggregate consideration of $180 million. In accordance with the Subscription Agreement, on July 29, 2014, an additional 1,800 shares of Preferred Stock were issued by PHI to Exelon for a purchase price of $18 million. The holders of the Preferred Stock will be entitled to receive a cumulative, non-participating cash dividend of 0.1% per annum, payable quarterly, when, as and if declared by PHI's board of directors. The proceeds from the issuance of the Preferred Stock are not subject to restrictions and are intended to serve as a prepayment of any applicable reverse termination fee payable from Exelon to PHI. The Preferred Stock will be redeemable on the terms and in the circumstances set forth in the Merger Agreement and the Subscription Agreement.

Consummation of the Merger is subject to the satisfaction or waiver of specified closing conditions, including (i) the approval of the Merger by the holders of a majority of the outstanding shares of common stock of PHI; (ii) the receipt of regulatory approvals required to consummate the Merger, including approvals from FERC, the Federal Communications Commission, the Delaware Public Service Commission (DPSC), the District of Columbia Public Service Commission (DCPSC), the Maryland Public Service Commision (MPSC), the New Jersey Board of Public Utilities (NJBPU) and the Virginia State Corporation Commission (VSCC);
(iii) the expiration or termination of the applicable waiting period under the Hart-Scott-Rodino Antitrust Improvements Act of 1976; and (iv) other customary closing conditions, including (a) the accuracy of each party's representations and warranties (subject to customary materiality qualifiers) and (b) each party's compliance with its obligations and covenants contained in the Merger Agreement (including covenants that may limit, restrict or prohibit PHI and its subsidiaries from taking specified actions during the period between the date of the Merger Agreement and the closing of the Merger or the termination of the Merger Agreement). In addition, the obligations of Exelon and Merger Sub to consummate the Merger are subject to the required regulatory approvals not imposing terms, conditions, obligations or commitments, individually or in the aggregate, that constitute a burdensome condition (as defined in the Merger Agreement). The parties currently anticipate that the closing will occur in the second or third quarter of 2015.

The Merger Agreement may be terminated by each of PHI and Exelon under certain circumstances, including if the Merger is not consummated by July 29, 2015 (subject to extension to October 29, 2015, if all of the conditions to closing, other than the conditions related to obtaining regulatory approvals, have been satisfied). The Merger Agreement also provides for certain termination rights for both PHI and Exelon, and further provides that, upon termination of the Merger Agreement under certain specified circumstances, PHI will be required to pay Exelon a termination fee of $259 million or reimburse Exelon


Table of Contents

PEPCO HOLDINGS

for its expenses up to $40 million (which reimbursement of expenses shall reduce on a dollar for dollar basis any termination fee subsequently payable by PHI), provided, however, that if the Merger Agreement is terminated in connection with an acquisition proposal made under certain circumstances by a person who made an acquisition proposal between April 1, 2014 and the date of the Merger Agreement, the termination fee will be $293 million plus reimbursement of Exelon for its expenses up to $40 million (not subject to offset). In addition, if the Merger Agreement is terminated under certain circumstances due to the failure to obtain regulatory approvals or the breach by Exelon of its obligations in respect of obtaining regulatory approvals (a Regulatory Termination), PHI will be able to redeem any issued and outstanding Preferred Stock at par value. If the Merger Agreement is terminated, other than for a Regulatory Termination, PHI will be required to redeem the Preferred Stock at the purchase price of $10,000 per share, plus any unpaid accrued and accumulated dividends thereupon.

Power Delivery

Power Delivery Electric consists primarily of the transmission, distribution and default supply of electricity, and Power Delivery Gas consists of the delivery and supply of natural gas.

The Pepco, DPL and ACE service territories are located within a corridor extending from the District of Columbia to southern New Jersey. These service territories are economically diverse and include key industries that contribute to the regional economic base:

Commercial activities in the region include banking and other professional and medical services, government and education, insurance, shopping malls, casinos, tourism and transportation.

Industrial activities in the region include chemical, glass, pharmaceutical, steel manufacturing, food processing and oil refining.

Each utility comprising Power Delivery is a regulated public utility in the jurisdictions that comprise its service territory. Each utility is responsible for the distribution of electricity and, in the case of DPL, natural gas in its service territory, for which it is paid tariff rates established by the applicable local public service commission in each jurisdiction. Each utility also supplies electricity at regulated rates to retail customers in its service territory who do not elect to purchase electricity from a competitive energy supplier. The regulatory term for this supply service is standard offer service (SOS) in Delaware, the District of Columbia and Maryland, and Basic Generation Service (BGS) in New Jersey. These supply service obligations are referred to generally as Default Electricity Supply.

Each of Pepco, DPL and ACE is responsible for the transmission of wholesale electricity into and across its service territory. The rates each utility is permitted to charge for the wholesale transmission of electricity are regulated by FERC. Transmission rates are updated annually based on a FERC-approved formula methodology.

The profitability of Power Delivery depends on its ability to recover costs and earn a reasonable return on its capital investments through the rates it is permitted to charge. Operating results also can be affected by economic conditions generally, the level of commercial activity affecting a region, industry or business sector within a service territory, energy prices, the impact of energy efficiency measures on customer usage of electricity and weather.

Power Delivery's results historically have been seasonal, generally producing higher revenue and income in the warmest and coldest periods of the year. For retail customers of Pepco and DPL in Maryland and of Pepco in the District of Columbia, revenue is not affected by unseasonably warmer or colder weather because a bill stabilization adjustment (BSA) was implemented that provides for a fixed distribution charge per customer rather than a charge based upon energy usage. The BSA has the effect of decoupling the distribution revenue recognized in a reporting period from the amount of power delivered during the period. As a result, the only factors that will cause distribution revenue from retail customers in Maryland and the District of Columbia to fluctuate from period to period are changes in the number of customers


Table of Contents

PEPCO HOLDINGS

and changes in the approved distribution charge per customer. A comparable revenue decoupling mechanism for DPL electricity and natural gas customers in Delaware is under consideration by the DPSC.

In accounting for the BSA in Maryland and the District of Columbia, a Revenue Decoupling Adjustment (an adjustment equal to the amount by which revenue from distribution sales differs from the revenue that Pepco and DPL are entitled to earn based on the approved distribution charge per customer) is recorded representing either (i) a positive adjustment equal to the amount by which revenue from retail distribution sales falls short of the revenue that Pepco and DPL are entitled to earn based on the approved distribution charge per customer or (ii) a negative adjustment equal to the amount by which revenue from such distribution sales exceeds the revenue that Pepco and DPL are entitled to earn based on the approved distribution charge per customer.

PHI's utility subsidiaries devote a substantial portion of their total capital expenditures to improving the reliability of their electrical transmission and distribution systems and replacing aging infrastructure throughout their service territories. These activities include:

identifying and upgrading under-performing feeder lines;

adding new facilities to support load;

installing distribution automation systems on both the overhead and underground network systems; and

rejuvenating and replacing underground residential cables.

Power Delivery Initiatives and Activities

Smart Grid Initiatives

PHI's utility subsidiaries are engaged in transforming the power grid that they own and operate into a "smart grid," a network of automated digital devices capable of collecting and communicating large amounts of real-time data.

A central component of the smart grid is AMI, a system that collects, measures and analyzes energy usage data from advanced digital meters, known as "smart meters." Also critical to the operation of the smart grid is distribution automation technology, which is comprised of automated devices that have internal intelligence and can be controlled remotely to better manage power flow and restore service quickly and more safely. Both the AMI system and distribution automation are enabled by advanced technology that communicates with devices installed on the energy delivery system and transmits energy usage data to the host utility. The implementation of the AMI system and distribution automation involves an integration of technologies provided by multiple vendors.

The DCPSC, the MPSC and the DPSC have approved the creation by PHI's utility subsidiaries of regulatory assets to defer AMI costs between rate cases and to defer carrying charges on the deferred costs. Thus, these costs will be recovered in the future through base rates; however, for AMI costs incurred by Pepco in Maryland with respect to test years after 2011, pursuant to an MPSC order, the recovery of such costs will be allowed when Pepco demonstrates that the AMI system is cost-effective. The MPSC's July 2013 order in Pepco's November 2012 electric distribution base rate application excluded the cost of AMI meters from Pepco's rate base until such time as Pepco demonstrates the cost effectiveness of the AMI system. As a result, costs for AMI meters incurred with respect to the 2012 test year and beyond will be treated as other incremental AMI costs incurred in conjunction with the deployment of the AMI system that are deferred and on which a carrying charge is deferred, but only until such cost effectiveness has been demonstrated and such costs are included in rates.


Table of Contents

PEPCO HOLDINGS

In 2010, two of PHI's utility subsidiaries were granted cash awards in the aggregate amount of $168 million by the U.S. Department of Energy to support their smart grid initiatives.

Pepco was awarded $149 million for AMI, direct load control, distribution automation and communications infrastructure, of which $148 million has been received through June 30, 2014.

ACE was awarded $19 million for direct load control, distribution automation and communications infrastructure, of which $19 million has been received through June 30, 2014.

Mitigation of Regulatory Lag

An important factor in the ability of PHI's utility subsidiaries to earn their authorized ROE is the willingness of applicable public service commissions to adequately address the shortfall in revenues in a utility's rate structure due to the delay in time or "lag" between when costs are incurred and when they are reflected in rates. This delay is commonly known as "regulatory lag." Pepco, DPL and ACE are currently experiencing significant regulatory lag because investments in rate base and operating expenses are increasing more rapidly than their revenue growth.

In an effort to minimize the effects of regulatory lag, PHI's utility subsidiaries had been filing electric distribution base rate cases every nine to twelve months in each of their jurisdictions, pursuing alternative ratemaking mechanisms, evaluating potential reductions in planned capital expenditures, and discussing with the regulatory community and other stakeholders the changing regulatory model economics that are causing regulatory lag.

As further described in "Management's Discussion of Analysis of Financial Condition and Results of Operations-General Overview-Agreement and Plan of Merger," PHI has entered into the Merger Agreement with Exelon and Merger Sub. Subject to certain exceptions, prior to the Merger or the termination of the Merger Agreement, PHI and its subsidiaries may not, without the consent of Exelon, initiate, file or pursue any rate cases, other than concluding pending filings. In addition, the regulatory commissions may seek to suspend or delay one or more of the ongoing proceedings as a result of the Merger Agreement.

MAPP Settlement Agreement

On February 28, 2014, FERC issued an order approving the settlement agreement submitted by Pepco and DPL in connection with Pepco's and DPL's proceeding seeking recovery of approximately $88 million in abandonment costs related to the Mid-Atlantic Power Pathway (MAPP) project. PHI had been directed by PJM to construct the MAPP project, a 152-mile high-voltage interstate transmission line, and was subsequently directed by PJM to cancel it. The abandonment costs sought for recovery were subsequently reduced to $82 million from write-offs of certain disallowed costs in 2013 and transfers of materials to inventories for use on other projects. Under the terms of the FERC-approved settlement agreement, Pepco and DPL will receive $80.5 million of transmission revenues over a three-year period, which began on June 1, 2013, and will retain title to all real property and property rights acquired in connection with the MAPP project, which had an estimated fair value of $8 million. The FERC-approved settlement agreement resolves all issues concerning the recovery of abandonment costs associated with the cancellation of the MAPP project, and the terms of the settlement agreement are not subject to modification through any other FERC proceeding. As of June 30, 2014, PHI had a regulatory asset related to the MAPP abandonment costs of approximately $46 million, net of amortization, and land of $8 million. PHI expects to recognize pre-tax income related to the MAPP abandonment costs of $3 million in 2014 and $1 million in 2015.


Table of Contents

PEPCO HOLDINGS

Transmission ROE Challenge

In February 2013, the public service commissions and public advocates of the District of Columbia, Maryland, Delaware and New Jersey, as well as the Delaware Municipal Electric Corporation, Inc. (DEMEC), filed a joint complaint with FERC against Pepco, DPL and ACE, as well as BGE. The complainants challenged the base ROE and the application of the formula rate process, each associated with the transmission service that PHI's utilities provide. The complainants support an ROE within a zone of reasonableness of 6.78% and 10.33%, and have argued for a base ROE of 8.7%. The base ROE currently authorized by FERC for PHI's utilities is (i) 11.3% for facilities placed into service after January 1, 2006, and
(ii) 10.8% for facilities placed into service prior to 2006. As currently authorized, the 10.8% base ROE for facilities placed into service prior to 2006 is eligible for a 50-basis-point incentive adder for being a member of a regional transmission organization. PHI, Pepco, DPL and ACE believe the allegations in this complaint are without merit and are vigorously contesting it. In April 2013, Pepco, DPL and ACE filed their answer to this complaint, requesting that FERC dismiss the complaint against them on the grounds that it failed to meet the required burden to demonstrate that the existing rates and protocols are unjust and unreasonable. PHI cannot predict when a final FERC decision in this proceeding will be issued. Under the Merger Agreement, PHI is permitted, and will continue, to pursue the conclusion of this matter.

On June 19, 2014, FERC issued an order in a proceeding in which the PHI utilities were not involved, in which it adopted a new ROE methodology for electric utilities. This new methodology replaces the existing one-step discounted cash flow analysis (which incorporates only short-term growth rates) traditionally used to derive ROE for electric utilities with the two-step discounted cash flow analysis (which incorporates both short-term and long-term measures of growth) used for natural gas and oil pipelines. Although FERC has not yet issued an order related to the February 2013 complaint, Pepco, DPL and ACE believe that it is probable that FERC will direct each utility to use this methodology at the time it issues an order addressing the complaint. As a result, Pepco, DPL and ACE applied an estimated ROE based on the two-step methodology announced by FERC for the period over which each of their transmission revenues would be subject to refund as a result of the challenge, and have recorded estimated reserves in the second quarter of 2014 related to this matter.

Pepco Energy Services

Pepco Energy Services is focused on growing its energy savings business and its underground transmission and distribution construction business while managing its thermal assets in Atlantic City. The energy savings business focuses on developing, building and operating energy savings performance contracting solutions primarily for federal, state and local government customers. After a significant slowdown in 2012, the energy savings market improved in 2013, however the market has not returned to the level of activity prior to 2012. The market is expected to continue to improve as the long-term fundamentals of the energy savings business remain strong. Pepco Energy Services' underground transmission and distribution construction business focuses on providing construction and maintenance services for electric power utilities in North America.

PHI guarantees the obligations of Pepco Energy Services under certain contracts in its energy savings performance contracting business and underground transmission and distribution construction business. At June 30, 2014, PHI's guarantees of Pepco Energy Services' obligations under these contracts totaled $255 million. PHI also guarantees the obligations of Pepco Energy Services under surety bonds obtained by Pepco Energy Services for construction projects. These guarantees totaled $218 million at June 30, 2014.

During 2012, Pepco Energy Services deactivated its Buzzard Point and Benning Road oil-fired generation facilities. Pepco Energy Services has determined that it will pursue the demolition of the Benning Road generation facility and realize the scrap metal salvage value of the facility. The demolition of the facility commenced in the fourth quarter of 2013 and is expected to be completed in the first quarter of 2015. Pepco Energy Services will recognize the salvage proceeds associated with the scrap metals at the facility as realized.


Table of Contents

PEPCO HOLDINGS

Revenues associated with Pepco Energy Services' combined heat and power thermal generating plant and operation in Atlantic City are derived from long-term contracts with a few major customers in the Atlantic City hotel and casino industry. The Atlantic City hotel and casino industry has been experiencing overcapacity and a decrease in gaming revenues, as well as competition from casinos that have been recently opened in nearby markets. This industry also faces potential competition from new casinos being constructed in nearby markets. In July 2014, a significant customer of this thermal operation reported that it is considering closure if it does not find a suitable buyer for its facilities. Future developments with respect to this customer may require Pepco Energy Services to perform an impairment analysis of the thermal operation and certain related assets with an aggregate carrying value as of June 30, 2014 of approximately $74 million. If these assets are determined to be impaired, Pepco Energy Services would reduce the carrying value of these assets by the amount of the impairment and record a corresponding non-cash charge to earnings, which could be material. Moreover, such a closure by this customer could reduce Pepco Energy Services' future earnings associated with the thermal operation.

Corporate and Other

Corporate and other includes the remaining operations of the former Other Non-regulated segment, certain parent company transactions including goodwill, interest expense on parent company debt, merger-related costs and inter-company eliminations.

Between 1990 and 1999, PCI entered into certain transactions involving investments in aircraft and aircraft equipment, railcars and other assets. In connection with these transactions, PCI recorded deferred tax assets in prior years of $101 million in the aggregate. After evaluating events that took place during the first quarter of 2013, PCI established valuation allowances against these deferred tax assets totaling $101 million in the first quarter of 2013. Further, during the fourth quarter of 2013, in light of additional court . . .

  Add POM to Portfolio     Set Alert         Email to a Friend  
Get SEC Filings for Another Symbol: Symbol Lookup
Quotes & Info for POM - All Recent SEC Filings
Copyright © 2014 Yahoo! Inc. All rights reserved. Privacy Policy - Terms of Service
SEC Filing data and information provided by EDGAR Online, Inc. (1-800-416-6651). All information provided "as is" for informational purposes only, not intended for trading purposes or advice. Neither Yahoo! nor any of independent providers is liable for any informational errors, incompleteness, or delays, or for any actions taken in reliance on information contained herein. By accessing the Yahoo! site, you agree not to redistribute the information found therein.