Form 10-Q for PPL CORP


2-May-2014

Quarterly Report


Item 2. Combined Management's Discussion and Analysis of Financial Condition and Results of Operations

(All Registrants)

This Item 2. "Combined Management's Discussion and Analysis of Financial Condition and Results of Operations" is separately filed by PPL Corporation and each of its Subsidiary Registrants. Information contained herein relating to any individual Registrant is filed by such Registrant solely on its own behalf, and no Registrant makes any representation as to information relating to any other Registrant. The specific Registrant to which disclosures are applicable is identified in parenthetical headings in italics above the applicable disclosure or within the applicable disclosure for each Registrant's related activities and disclosures. Within combined disclosures, amounts are disclosed for any Registrant when significant.

The following should be read in conjunction with the Registrants' Condensed Consolidated Financial Statements and the accompanying Notes and with the Registrants' 2013 Form 10-K. Capitalized terms and abbreviations are defined in the glossary. Dollars are in millions, except per share data, unless otherwise noted.

"Management's Discussion and Analysis of Financial Condition and Results of Operations" includes the following information:

"Overview" provides a description of each Registrant's business strategy, a summary of PPL's earnings, a description of key factors expected to impact future earnings and a discussion of important financial and operational developments.

"Results of Operations" for PPL provides a more detailed analysis of earnings by segment, and for the Subsidiary Registrants includes a summary of earnings. For all Registrants, "Margins" provides explanations of non-GAAP financial measures and "Statement of Income Analysis" addresses significant changes in principal items on the Statements of Income, comparing the three months ended March 31, 2014 with 2013.

"Financial Condition - Liquidity and Capital Resources" provides an analysis of the Registrants' liquidity positions and credit profiles. This section also includes a discussion of rating agency actions.

"Financial Condition - Risk Management" provides an explanation of the Registrants' risk management programs relating to market and credit risk.

Overview

Introduction

(PPL)

PPL, headquartered in Allentown, Pennsylvania, is an energy and utility holding company. Through subsidiaries, PPL delivers electricity to customers in the U.K., Pennsylvania, Kentucky, Virginia and Tennessee; delivers natural gas to customers in Kentucky; generates electricity from power plants in the northeastern, northwestern and southeastern U.S.; and markets wholesale or retail energy primarily in the northeastern and northwestern portions of the U.S.


PPL's principal subsidiaries are shown below (* denotes an SEC registrant):

PPL Corporation*

PPL Capital Funding

              PPL Global                                LKE*                  PPL Electric*               PPL Energy Supply*
         ? Engages in the                                                    ? Engages in the
         regulated                                                           regulated
         distribution of                                                     transmission and
         electricity in the                                                  distribution of
         U.K.                                                                electricity in
                                                                             Pennsylvania


                                     LG&E*                              KU*                  PPL EnergyPlus              PPL Generation
                       ? Engages in the regulated               ? Engages in the          ? Performs energy             ? Engages in the
                       generation, transmission,                regulated                 marketing and trading         competitive
                       distribution and sale of                 generation,               activities                    generation of
                       electricity, and distribution and        transmission,             ? Purchases fuel              electricity,
                       sale of natural gas in Kentucky          distribution and                                        primarily in
                                                                sale of                                                 Pennsylvania and
                                                                electricity,                                            Montana
                                                                primarily in
                                                                Kentucky

            U.K. Regulated                       Kentucky Regulated            Pennsylvania                     Supply
                Segment                                Segment                  Regulated                      Segment
                                                                                 Segment

PPL's reportable segments' results primarily represent the results of its related Subsidiary Registrants, except that the reportable segments are also allocated certain corporate level financing and other costs that are not included in the results of the applicable Subsidiary Registrants. The U.K. Regulated segment does not have a related Subsidiary Registrant.

(PPL Energy Supply)

PPL Energy Supply, headquartered in Allentown, Pennsylvania, is an indirect wholly owned subsidiary of PPL and is an energy company that through its principal subsidiaries is primarily engaged in the competitive generation and marketing of electricity in two key markets: the northeastern and northwestern U.S. PPL Energy Supply's principal subsidiaries are PPL EnergyPlus, its marketing and trading subsidiary, and PPL Generation, the owner of its generating facilities in Pennsylvania and Montana.

(PPL Electric)

PPL Electric, headquartered in Allentown, Pennsylvania, is a direct wholly owned subsidiary of PPL and a regulated public utility that is an electricity transmission and distribution service provider in eastern and central Pennsylvania. PPL Electric is subject to regulation as a public utility by the PUC, and certain of its transmission activities are subject to the jurisdiction of FERC under the Federal Power Act. PPL Electric delivers electricity in its Pennsylvania service area and provides electricity supply to retail customers in that area as a PLR under the Customer Choice Act.

(LKE)

LKE, headquartered in Louisville, Kentucky, is a wholly owned subsidiary of PPL and a holding company that owns regulated utility operations through its subsidiaries, LG&E and KU, which constitute substantially all of LKE's assets. LG&E and KU are engaged in the generation, transmission, distribution and sale of electricity. LG&E also engages in the distribution and sale of natural gas. LG&E and KU maintain their separate corporate identities and serve customers in Kentucky under their respective names. KU also serves customers in Virginia under the Old Dominion Power name and in Tennessee under the KU name.

(LG&E)

LG&E, headquartered in Louisville, Kentucky, is a wholly owned subsidiary of LKE and a regulated utility engaged in the generation, transmission, distribution and sale of electricity and distribution and sale of natural gas in Kentucky. LG&E is


subject to regulation as a public utility by the KPSC, and certain of its transmission activities are subject to the jurisdiction of the FERC under the Federal Power Act.

(KU)

KU, headquartered in Lexington, Kentucky, is a wholly owned subsidiary of LKE and a regulated utility engaged in the generation, transmission, distribution and sale of electricity in Kentucky, Virginia and Tennessee. KU is subject to regulation as a public utility by the KPSC, the VSCC and the TRA, and certain of its transmission and wholesale power activities are subject to the jurisdiction of the FERC under the Federal Power Act. KU serves its Virginia customers under the Old Dominion Power name and its Kentucky and Tennessee customers under the KU name.

Business Strategy

(All Registrants except PPL Energy Supply)

The strategy for the regulated businesses of WPD, PPL Electric, LKE, LG&E and KU is to provide efficient, reliable and safe operations and strong customer service, maintain constructive regulatory relationships and achieve timely recovery of costs. These regulated businesses also focus on providing competitively priced energy to customers and achieving stable, long-term growth in earnings and rate base, or RAV, as applicable. Both rate base and RAV are expected to grow for the foreseeable future as a result of significant capital expenditure programs to maintain existing assets and to improve system reliability and, for LKE, LG&E and KU, to comply with federal and state environmental regulations related to electricity generation facilities. Future RAV for WPD will also be affected by RIIO-ED1, effective April 1, 2015, as the recovery period for assets placed in service after that date will be extended from 20 to 45 years. See "Other Financial and Operational Developments - RIIO-ED1 - Fast Tracking" below for additional information.

Recovery of capital project costs is attained through various rate-making mechanisms, including periodic base rate case proceedings, FERC formula rate mechanisms, and other regulatory agency-approved recovery mechanisms. In Kentucky, the KPSC has adopted a series of regulatory mechanisms (ECR, DSM, GLT, fuel adjustment clause, gas supply clause and recovery on certain construction work-in-progress) that reduce regulatory lag and provide for timely recovery of prudently incurred costs. In Pennsylvania, the FERC transmission formula rate, DSIC mechanism and other recovery mechanisms are in place to reduce regulatory lag and provide for timely recovery of prudently incurred costs. See "Item 1. Business - Segment Information - U.K. Regulated Segment - Revenues and Regulation" in PPL's 2013 Form 10-K for changes to the regulatory framework in the U.K. applicable to WPD beginning in April 2015.

(PPL and PPL Energy Supply)

The strategy for PPL Energy Supply is to optimize the value from its competitive generation asset and marketing portfolios while mitigating near-term volatility in both cash flows and earnings. PPL Energy Supply endeavors to do this by matching energy supply with load, or customer demand, under contracts of varying durations with creditworthy counterparties to capture profits while effectively managing exposure to energy and fuel price volatility, counterparty credit risk and operational risk. PPL Energy Supply is focused on maintaining profitability during the current and projected period of low energy and capacity prices. See "Financial and Operational Developments - Economic and Market Conditions" below for additional information.

(PPL)

Earnings generated by PPL's U.K. subsidiaries are subject to foreign currency translation risk. The U.K. subsidiaries also have currency exposure to the U.S. dollar to the extent they have U.S. dollar denominated debt. To manage these risks, PPL generally uses contracts such as forwards, options and cross currency swaps that contain characteristics of both interest rate and foreign currency exchange contracts.

(All Registrants)

To manage financing costs and access to credit markets, and to fund capital expenditures, a key objective of the Registrants is to maintain targeted credit profiles and liquidity positions. In addition, the Registrants have financial and operational risk management programs that, among other things, are designed to monitor and manage exposure to earnings and cash flow volatility related to, as applicable, changes in energy and fuel prices, interest rates, counterparty credit quality and the operating performance of generating units. To manage these risks, PPL generally uses contracts such as forwards, options and swaps.


Financial and Operational Developments

Earnings (PPL)

PPL's earnings by reportable segment for the period ended March 31 were as
follows.

                                                              Three Months
                                                      2014       2013      % Change

U.K. Regulated                                       $   206    $   313        (34)
Kentucky Regulated                                       107         85         26
Pennsylvania Regulated                                    85         64         33
Supply                                                   (75)       (46)        63
Corporate and Other (a)                                   (7)        (3)       133
Net Income Attributable to PPL Shareowners           $   316    $   413        (23)

EPS - basic                                          $  0.50    $  0.70        (29)
EPS - diluted (b)                                    $  0.49    $  0.65        (25)

(a) Primarily represents financing and certain other costs incurred at the corporate level that have not been allocated or assigned to the segments, which are presented to reconcile segment information to PPL's consolidated results.

(b) See "2011 Equity Units" below and Note 4 to the Financial Statements for information on the Equity Units' impact on the calculation of diluted EPS.

The following after-tax gains (losses), in total, which management considers special items, impacted PPL's reportable segments' results for the period ended March 31. See PPL's "Results of Operations - Segment Earnings" for details of these special items.

Three Months

                      2014       2013

U.K. Regulated       $   (58)   $    75
Kentucky Regulated                    1
Supply                  (149)      (117)
Total PPL            $  (207)   $   (41)

The changes in PPL's reportable segments results for the three months ended March 31, 2014 compared with 2013, excluding the impact of special items, were due to the following factors (on an after-tax basis):

Increase at the U.K. Regulated segment primarily due to higher utility revenues driven by an April 1, 2013 price increase, and lower pension expense, partially offset by lower sales volumes due to weather, and higher depreciation.

Increase at the Kentucky Regulated segment primarily due to higher sales volumes due to unusually cold weather and returns from additional environmental capital investments, partially offset by higher operation and maintenance expense.

Increase at the Pennsylvania Regulated segment primarily due to higher transmission margins from additional capital investments, higher distribution margins due to unusually cold weather, and a benefit from a change in estimate of a regulatory liability.

Relatively flat at the Supply segment primarily due to higher capacity prices, net benefits from unusually cold weather and lower interest expense, offset by lower baseload energy prices and the timing of a planned outage at the Susquehanna nuclear power plant.

See "Results of Operations" below for further discussion of PPL's reportable segments and analysis of results of operations.

2014 Outlook

(PPL)

Excluding special items, lower earnings are expected in 2014 compared with 2013. The factors underlying these projections by segment and Subsidiary Registrant are discussed below (on an after-tax basis).

(PPL's U.K. Regulated Segment)

Excluding special items, higher earnings are projected in 2014 compared with 2013, primarily driven by higher electricity delivery revenue and lower pension expense, partially offset by higher income taxes, higher depreciation and higher financing costs.


(PPL's Kentucky Regulated Segment and LKE, LG&E and KU)

Excluding special items, lower earnings are projected in 2014 compared with 2013, primarily driven by higher operation and maintenance expense, higher depreciation and higher financing costs, partially offset by returns on additional environmental capital investments and increased sales volumes.

(PPL's Pennsylvania Regulated Segment and PPL Electric)

Excluding special items, higher earnings are projected in 2014 compared with 2013, primarily driven by higher transmission margins and returns on distribution improvement capital spending, partially offset by higher financing costs and higher income taxes.

(PPL's Supply Segment and PPL Energy Supply)

Excluding special items, lower earnings are projected in 2014 compared with 2013, primarily driven by lower energy and capacity prices, partially offset by the net realized benefits from unusually cold winter weather, lower financing costs and lower income taxes.

(All Registrants)

Earnings in future periods are subject to various risks and uncertainties. See "Forward-Looking Information," the rest of this Item 2, Notes 6 and 10 to the Financial Statements in this Form 10-Q (as applicable) and "Item 1. Business" and "Item 1A. Risk Factors" in the Registrants' 2013 Form 10-K for a discussion of the risks, uncertainties and factors that may impact future earnings.

Other Financial and Operational Developments

Economic and Market Conditions

(PPL and PPL Energy Supply)

Over the last few years, depressed wholesale market prices for electricity and natural gas have resulted from general weak economic conditions and other factors, including the impact of expanded domestic shale gas development and additional renewable energy sources. During the first quarter of 2014, the PJM region experienced unusually cold weather conditions, higher demand and congestion patterns that increased natural gas and electricity prices in spot and near-term forward markets.

See "Margins - Changes in Non-GAAP Financial Measures - Unregulated Gross Energy Margins" below for additional information on energy margins. Full year 2014 energy margins are still projected to be lower compared with 2013 due to a higher average hedge price in 2013, partially offset by higher pricing on unhedged generation. PPL Energy Supply continues to review its business and operational plans, including capital and operation and maintenance expenditures, its hedging strategies and potential plant modifications to burn lower cost fuels.

(All Registrants except PPL Electric)

The businesses of PPL Energy Supply, LKE, LG&E and KU are subject to extensive federal, state and local environmental laws, rules and regulations, including those pertaining to coal combustion residuals, GHG, effluent limitation guidelines and MATS. See "Financial Condition - Environmental Matters" below for additional information on these requirements. These and other stringent environmental requirements, combined with low energy margins for competitive generation, have led several energy companies, including PPL, PPL Energy Supply, LKE, LG&E and KU, to announce plans to either temporarily or permanently close, or place in long-term reserve status, and/or impair certain of their coal-fired generating plants during 2012 and 2013.

(PPL and PPL Energy Supply)

In September 2013, PPL Montana executed a definitive agreement to sell to NorthWestern 633 MW of hydroelectric generation facilities located in Montana for $900 million in cash, subject to certain adjustments. In April 2014, the U.S. Department of Justice and Federal Trade Commission granted early termination of PPL Montana's and NorthWestern's notifications under the Hart-Scott-Rodino Antitrust Improvements Act of 1976. The sale remains subject to closing


conditions, including receipt of regulatory approvals by the FERC and the Montana Public Service Commission and certain third-party consents. The sale is not expected to close before the second half of 2014.

PPL Energy Supply believes its competitive coal-fired generation assets in Pennsylvania are well positioned to meet current environmental requirements based on prior and planned investments. However, the current levels of energy and capacity prices in PJM, as well as management's forward view of these prices using its fundamental pricing models, continue to challenge the recoverability of PPL Energy Supply's investment in its Pennsylvania coal-fired generation assets. In the fourth quarter of 2013, management tested the Brunner Island and Montour plants for impairment and concluded neither was impaired as of December 31, 2013. The recoverability test was very sensitive to forward energy and capacity price assumptions, as well as forecasted operation and maintenance and capital spending. Therefore, a further decline in forecasted long-term energy or capacity prices or changes in environmental laws requiring additional capital or operation and maintenance expenditures, could negatively impact PPL Energy Supply's operations of these facilities and potentially result in future impairment charges for some or all of the carrying value of these plants. There were no events or changes in circumstances that indicated a recoverability test was required in the first quarter of 2014. However, PPL Energy Supply will be closely monitoring the PJM capacity auction results in May 2014, which could require a recoverability test to be performed in the second quarter of 2014. The carrying value of the Pennsylvania coal-fired generation assets was $2.6 billion as of March 31, 2014 ($1.4 billion for Brunner Island and $1.2 billion for Montour).

(All Registrants)

The Registrants cannot predict the impact that future economic and market conditions and regulatory requirements may have on their financial condition or results of operations.

(PPL)

Ofgem Review of Line Loss Calculation

In March 2014, Ofgem issued its final decision on the methodology to be used by all network operators to calculate the final line loss incentives and penalties for the DPCR4, which ended in March 2010. As a result, WPD recorded an increase of $65 million to its existing liability with a reduction to "Utility" revenue on the Statement of Income. WPD's total recorded liability at March 31, 2014 was $115 million, nearly all of which will be refunded to customers beginning April 1, 2015 through March 31, 2019. See Note 6 to the Financial Statements for additional information.

RIIO-ED1 - Fast Tracking

In February 2014, WPD elected to accept the decision of Ofgem to set the real cost of equity to be used during the RIIO-ED1 period at 6.4% compared to 6.7% proposed by WPD, and remain in the fast-track process. The change in the cost of equity is not expected to have a significant impact on the results of operations for PPL. Also, in February 2014, Ofgem published formal confirmation that WPD's Business Plans submitted by its four DNOs have been accepted as submitted, or "fast-tracked," for the 8-year price control period starting April 1, 2015. Fast tracking affords several benefits to the WPD DNOs including the ability to collect additional revenue equivalent to 2.5% of total annual expenditure during the 8-year price control period, or approximately $35 million annually, greater revenue certainty and a higher level of cost savings retention. See "Item 1. Business - Segment Information - U.K. Regulated Segment" of PPL's 2013 Form 10-K for additional information on RIIO-ED1.

2011 Equity Units

In March 2014, PPL Capital Funding remarketed $978 million of 4.32% Junior Subordinated Notes due 2019 that were originally issued in April 2011 as a component of PPL's 2011 Equity Units. In connection with the remarketing, PPL Capital Funding retired $228 million of the 4.32% Junior Subordinated Notes due 2019 and issued $350 million of 2.189% Junior Subordinated Notes due 2017 and $400 million 3.184% of Junior Subordinated Notes due 2019. Simultaneously the newly issued notes were exchanged for $350 million of 3.95% Senior Notes due 2024 and $400 million of 5.00% Senior Notes due 2044. Additionally, on May 1, 2014, PPL issued 31.7 million shares of common stock at $30.86 per share to settle the 2011 Purchase Contracts. PPL received net cash proceeds of $978 million, which will be used to repay short-term debt and for general corporate purposes.

Kerr Dam Project Arbitration Decision and Impairment (PPL Energy Supply)

PPL Montana holds a joint operating license issued for the Kerr Dam Project. The license extends until 2035 and, between 2015 and 2025, the Confederated Salish and Kootenai Tribes of the Flathead Nation (the Tribes) have the option to purchase,


hold and operate the Kerr Dam Project. The parties submitted the issue of the appropriate amount of the conveyance price to arbitration in February 2013. In March 2014, the arbitration panel issued its final decision holding that the conveyance price payable by the Tribes to PPL Montana is $18 million. As a result of the decision, PPL Energy Supply performed a recoverability test on the Kerr Dam Project and recorded an impairment charge of $18 million ($10 million after-tax) to reduce the carrying amount to its fair value of $29 million. See Note 13 to the Financial Statements for additional information.

Susquehanna Turbine Blade Inspection (PPL and PPL Energy Supply)

PPL Susquehanna continues to make modifications to address the causes of turbine blade cracking at the PPL Susquehanna nuclear plant that was first identified in 2011. In March 2014, Unit 2 completed its planned turbine inspection outage to replace blades. Unit 1 began its planned refueling and turbine inspection outage in April 2014. Similar blade replacements are planned and modifications will also be implemented to reduce the likelihood of blade cracking, including the installation of shorter last stage blades on one of the LP turbines. PPL Susquehanna will continue to monitor blade performance and work with the turbine manufacturer to identify and resolve the issues causing the blade cracking.

Storm Damage Expense Rider (SDER) (PPL Electric)

In its December 28, 2012 final rate case order, the PUC directed PPL Electric to file a proposed SDER. In March 2013, PPL Electric filed its proposed SDER with the PUC and, as part of that filing, requested recovery of the 2012 qualifying storm costs related to Hurricane Sandy. On April 3, 2014, the PUC issued a final order approving the SDER. The SDER will be effective January 1, 2015 and will initially include actual storm costs compared to collections from December 2013 through November 2014. As a result of the order, PPL Electric reduced its regulatory liability by $12 million related to collections in excess of costs incurred from January 1, 2013 to November 30, 2013 that are not required to be refunded to customers. Also, as part of the order, PPL Electric can recover Hurricane Sandy storm damage costs through the SDER over a three-year period beginning January 2015. See "Pennsylvania Activities - Storm Damage Expense Rider" in Note 6 to the Financial Statements for additional information.

FERC Formula Rates (LKE and KU)

In September 2013, KU filed an application with the FERC to adjust the formula rate under which KU provides wholesale requirements power sales to 12 municipal customers. Among other changes, the application requests an amended formula whereby KU would charge cost-based rates with a subsequent true-up to actual . . .

  Add PPL to Portfolio     Set Alert         Email to a Friend  
Get SEC Filings for Another Symbol: Symbol Lookup
Quotes & Info for PPL - All Recent SEC Filings
Copyright © 2014 Yahoo! Inc. All rights reserved. Privacy Policy - Terms of Service
SEC Filing data and information provided by EDGAR Online, Inc. (1-800-416-6651). All information provided "as is" for informational purposes only, not intended for trading purposes or advice. Neither Yahoo! nor any of independent providers is liable for any informational errors, incompleteness, or delays, or for any actions taken in reliance on information contained herein. By accessing the Yahoo! site, you agree not to redistribute the information found therein.