ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND
RESULTS OF OPERATIONS

Information Regarding Forward-Looking Statements

This quarterly report contains certain statements that are, or may be deemed to be, "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the "Exchange Act"). All statements, other than statements of historical fact, included herein or incorporated herein by reference are "forward-looking statements." Included among "forward-looking statements" are, among other things:
• statements that we expect to commence or complete construction of our proposed liquefied natural gas ("LNG") terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions thereof, by certain dates, or at all;

• statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;

• statements regarding any financing transactions or arrangements, or ability to enter into such transactions;

• statements relating to the construction of our natural gas liquefaction trains ("Trains"), including statements concerning the engagement of any engineering, procurement and construction ("EPC") contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;

• statements regarding any agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, liquefaction or storage capacities that are, or may become, subject to contracts;

• statements regarding counterparties to our commercial contracts, construction contracts and other contracts;

• statements regarding our planned construction of additional Trains, including the financing of such Trains;

• statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;

• statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections or objectives, including anticipated revenues and capital expenditures, any or all of which are subject to change;

• statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions;

• statements regarding our anticipated LNG and natural gas marketing activities; and

• any other statements that relate to non-historical or future information.

All of these types of statements, other than statements of historical fact, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as "may," "will," "could," "should," "expect," "plan," "project," "intend," "anticipate," "believe," "estimate," "predict," "potential," "pursue," "target," "continue," the negative of such terms or other comparable terminology. The forward-looking statements contained in this quarterly report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that the forward-looking statements contained in this quarterly report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements due to factors described in this quarterly report and in the other reports and other information that we file with the Securities and Exchange Commission ("SEC"). These forward-looking statements speak only as of the date made, and other than as required by law, we undertake no obligation to publicly update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

Our actual results could differ materially from those anticipated in these forward-looking statements as a result of a variety of factors, including those discussed under "Risk Factors" in our Annual Report on Form 10-K for the year ended December 31, 2013. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by

xiii

these risk factors. Other than as required under the securities laws, we assume no obligation to update or revise these forward-looking statements or provide reasons why actual results may differ.

As used herein, the terms "Cheniere," "the Company," "we," "our" and "us" refer to Cheniere Energy, Inc. and its wholly owned or controlled subsidiaries.

Introduction

The following discussion and analysis presents management's view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes in "Consolidated Financial Statements." This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Our discussion and analysis include the following subjects:
• Overview of Business

• Overview of Significant Events

• Liquidity and Capital Resources

• Results of Operations

• Off-Balance Sheet Arrangements

• Summary of Critical Accounting Estimates

• Recent Accounting Standards

Overview of Business

Cheniere Energy, Inc. (NYSE MKT: LNG), a Delaware corporation, is a Houston-based energy company primarily engaged in LNG-related businesses. We own and operate the Sabine Pass LNG terminal in Louisiana through our ownership interest in and management agreements with Cheniere Energy Partners, L.P. ("Cheniere Partners") (NYSE MKT: CQP), which is a publicly traded limited partnership that we created in 2007. We own 100% of the general partner interest in Cheniere Partners and 84.5% of Cheniere Energy Partners LP Holdings, LLC ("Cheniere Holdings") (NYSE MKT: CQH), which is a publicly traded limited liability company that owns a 55.9% limited partner interest in Cheniere Partners.

We formed Cheniere Holdings in 2013 to hold our limited partner interests in Cheniere Partners. In December 2013, Cheniere Holdings completed an initial public offering of 36.0 million common shares at $20.00 per common share (the "Cheniere Holdings Offering").

The Sabine Pass LNG terminal is located on the Sabine Pass deep water shipping channel less than four miles from the Gulf Coast. The Sabine Pass LNG terminal has operational regasification facilities owned by Cheniere Partners' wholly owned subsidiary, Sabine Pass LNG, L.P. ("Sabine Pass LNG"), that includes existing infrastructure of five LNG storage tanks with capacity of approximately
16.9 Bcfe, two docks that can accommodate vessels with capacity of up to 265,000 cubic meters and vaporizers with regasification capacity of approximately 4.0 Bcf/d. Cheniere Partners is developing and constructing natural gas liquefaction facilities (the "Sabine Pass Liquefaction Project") at the Sabine Pass LNG terminal adjacent to the existing regasification facilities through a wholly owned subsidiary, Sabine Pass Liquefaction, LLC ("Sabine Pass Liquefaction"). Cheniere Partners plans to construct up to six Trains, which are in various stages of development. Each Train is expected to have nominal production capacity of approximately 4.5 million tonnes per annum ("mtpa"). Cheniere Partners also owns the 94-mile Creole Trail Pipeline through a wholly owned subsidiary, Cheniere Creole Trail Pipeline, L.P. ("CTPL"), which interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines. One of our subsidiaries, Cheniere Marketing, LLC ("Cheniere Marketing"), is engaged in the LNG and natural gas marketing business and is seeking to develop a portfolio of long-term, short-term and spot LNG purchase and sale agreements. Cheniere Marketing has entered into an LNG Sale and Purchase Agreement ("SPA") with Sabine Pass Liquefaction to purchase, at Cheniere Marketing's option, up to 104,000,000 MMBtu/yr of LNG.

We are developing a second natural gas liquefaction and export facility near Corpus Christi, Texas (the "Corpus Christi Liquefaction Project"). As currently contemplated, the proposed Corpus Christi Liquefaction LNG terminal would be designed for up to three Trains, with expected aggregate nominal production capacity of approximately 13.5 mtpa of LNG, three LNG storage tanks with capacity of 10.1 Bcfe and two docks that can accommodate vessels with capacity of up to 267,000 cubic meters.

xiv

We are also in various stages of developing other projects, which, among other things, will require acceptable commercial and financing arrangements before we make a final investment decision.

Overview of Significant Events

Our significant accomplishments since January 1, 2014 and through the filing date of this Form 10-Q include the following:
• In April 2014, our wholly owned subsidiary, Corpus Christi Liquefaction, LLC ("Corpus Christi Liquefaction"), entered into two SPAs with Endesa S.A. ("Endesa") under which Endesa has agreed to purchase a total of 117.3 million MMBtu of LNG per year (approximately 2.25 mtpa) upon the commencement of operations from the Corpus Christi Liquefaction Project.

• In April 2014, Sabine Pass Liquefaction entered into a $325.0 million senior letter of credit and reimbursement agreement (the "Sabine Pass Liquefaction LC Agreement") that it intends to use for the issuance of letters of credit on behalf of Sabine Pass Liquefaction for certain working capital requirements related to the Sabine Pass Liquefaction Project.

Liquidity and Capital Resources

Although results are consolidated for financial reporting, Cheniere, Cheniere Holdings, Cheniere Partners, Sabine Pass Liquefaction and Sabine Pass LNG operate with independent capital structures. We expect the cash needs for at least the next twelve months will be met for each of these independent capital structures as follows:
•Sabine Pass LNG through operating cash flows and existing unrestricted cash;
•Sabine Pass Liquefaction through project debt and equity financings;
•Cheniere Partners through operating cash flows from Sabine Pass LNG and existing unrestricted cash;
•Cheniere Holdings through distributions from Cheniere Partners; and
•Cheniere through existing unrestricted cash, services fees from Cheniere Holdings, Cheniere Partners and its other subsidiaries, distributions from our investments in Cheniere Holdings and Cheniere Partners and operating cash flows from our LNG and natural gas marketing business. In addition, we expect to finance the construction costs of the Corpus Christi Liquefaction Project from one or more of the following: project financing, debt and equity offerings and operating cash flow.

As of March 31, 2014, we had cash and cash equivalents of $914.6 million available to Cheniere. In addition, we had current and non-current restricted cash and cash equivalents of $850.2 million (which included current and non-current restricted cash and cash equivalents available to Cheniere Partners, Sabine Pass Liquefaction and Sabine Pass LNG) designated for the following purposes: $294.4 million for the Sabine Pass Liquefaction Project; $76.7 million for CTPL; $129.1 million for interest payments related to the Sabine Pass LNG Senior Notes described below; and $350.0 million for other restricted purposes.

Cheniere Holdings

Cheniere Holdings was formed by us to hold our Cheniere Partners limited partner interests, thereby allowing us to segregate our lower risk, stable, cash flow generating assets from our higher risk, early stage development projects and marketing activities. As of March 31, 2014, we had an 84.5% direct ownership interest in Cheniere Holdings. We receive dividends on our Cheniere Holdings shares from the distributions that Cheniere Holdings receives from Cheniere Partners, and we receive management fees for managing Cheniere Holdings. For the three months ended March 31, 2014, we received $3.3 million in dividends on our Cheniere Holdings common shares and $0.1 million of management fees from Cheniere Holdings.

Cheniere Partners

Our ownership interest in the Sabine Pass LNG terminal is held through Cheniere Partners. Through our interest in Cheniere Holdings, we indirectly own a 47.2% limited partner interest in Cheniere Partners in the form of 11,963,488 common units, 45,333,334 Class B units and 135,383,831 subordinated units. We also indirectly own a 2% general partner interest and the incentive distribution rights in Cheniere Partners. Cheniere Partners owns a 100% interest in Sabine Pass LNG, which is operating

xv

the regasification facilities at the Sabine Pass LNG terminal, and a 100% interest in Sabine Pass Liquefaction, which is constructing the Sabine Pass Liquefaction Project.

Prior to the Cheniere Holdings Offering, we received quarterly equity distributions from Cheniere Partners related to our limited partner and 2% general partner interests. We will continue to receive quarterly equity distributions from Cheniere Partners related to our 2% general partner interest, and we receive fees for providing services to Cheniere Partners, Sabine Pass LNG, Sabine Pass Liquefaction and CTPL. During the three months ended March 31, 2014, we received $0.5 million in distributions on our general partner interest and $40.0 million in total service fees, from Cheniere Partners, Sabine Pass LNG, Sabine Pass Liquefaction and CTPL.

Cheniere Partners' common unit and general partner distributions are being funded from accumulated operating surplus. We have not received distributions on our subordinated units with respect to the quarters ended on or after June 30, 2010. Cheniere Partners will not make distributions on our subordinated units until it generates additional cash flow from Sabine Pass LNG's excess capacity, the Sabine Pass Liquefaction Project or other new business, which would be used to make quarterly distributions on our subordinated units before any increase in distributions to the common unitholders.

Cheniere Partners' Class B units are subject to conversion, mandatorily or at the option of the Class B unitholders under specified circumstances, into a number of common units based on the then-applicable conversion value of the Class B units. The Cheniere Partners Class B units are not entitled to cash distributions except in the event of a liquidation of Cheniere Partners, a merger, consolidation or other combination of Cheniere Partners with another person or the sale of all or substantially all of the assets of Cheniere Partners. On a quarterly basis beginning on the initial purchase of the Class B units and ending on the conversion date of the Class B units, the conversion value of the Class B units increases at a compounded rate of 3.5% per quarter, subject to an additional upward adjustment for certain equity and debt financings. The accreted conversion ratio of the Class B units owned by Cheniere Holdings and Blackstone CQP Holdco LP ("Blackstone") was 1.27 and 1.25, respectively, as of March 31, 2014. We expect the Class B units to mandatorily convert into common units within 90 days of the substantial completion date of Train 3 of the Sabine Pass Liquefaction Project, which Cheniere Partners currently expects to occur before March 31, 2017. If the Class B units are not mandatorily converted by July 2019, the holders of the Class B units have the option to convert the Class B units into common units at that time.

LNG Terminal Business

Sabine Pass LNG Terminal

Regasification Facilities

The Sabine Pass LNG terminal has operational regasification capacity of approximately 4.0 Bcf/d and aggregate LNG storage capacity of approximately 16.9 Bcfe. Approximately 2.0 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party terminal use agreements ("TUAs"), under which Sabine Pass LNG's customers are required to pay fixed monthly fees, whether or not they use the LNG terminal. Each of Total Gas & Power North America, Inc. ("Total") and Chevron U.S.A. Inc. ("Chevron") has reserved approximately 1.0 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to Sabine Pass LNG aggregating approximately $125 million annually for 20 years that commenced in 2009. Total S.A. has guaranteed Total's obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron's obligations under its TUA up to 80% of the fees payable by Chevron.

The remaining approximately 2.0 Bcf/d of capacity has been reserved under a TUA by Sabine Pass Liquefaction. Sabine Pass Liquefaction is obligated to make monthly capacity payments to Sabine Pass LNG aggregating approximately $250 million annually, continuing until at least 20 years after Sabine Pass Liquefaction delivers its first commercial cargo at the Sabine Pass Liquefaction Project.

Under each of these TUAs, Sabine Pass LNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

xvi

Liquefaction Facilities

The Sabine Pass Liquefaction Project is being developed and constructed at the Sabine Pass LNG terminal adjacent to the existing regasification facilities. We commenced construction of Trains 1 and 2 and the related new facilities needed to treat, liquefy, store and export natural gas in August 2012. Construction of Trains 3 and 4 and the related facilities commenced in May 2013. We are developing Trains 5 and 6 and commenced the regulatory approval process for these Trains in February 2013.

Cheniere Partners has received authorization from the Federal Energy Regulatory Commission (the "FERC") to site, construct and operate Trains 1 through 4. Cheniere Partners has also filed an application with the FERC for the approval to construct Trains 5 and 6. The Department of Energy (the "DOE") has granted Sabine Pass Liquefaction an order authorizing the export of up to the equivalent of 16 mtpa (approximately 803 Bcf/yr) of LNG to all nations with which trade is permitted for a 20-year term beginning on the earlier of the date of first export from Train 1 or August 7, 2017. The DOE further issued orders authorizing the export of an additional 503.3 Bcf/yr in total of domestically produced LNG from the Sabine Pass LNG terminal to free trade agreement ("FTA") countries providing for national treatment for trade in natural gas for a 20-year term.

As of March 31, 2014, the overall project completion for Trains 1 and 2 and Trains 3 and 4 of the Sabine Pass Liquefaction Project were approximately 63% and 27%, respectively, which are ahead of the contractual schedule. Based on our current construction schedule, we anticipate that Train 1 will produce LNG as early as late 2015, and Trains 2, 3 and 4 are expected to commence operations on a staggered basis thereafter.

Customers

Sabine Pass Liquefaction has entered into four fixed price, 20-year SPAs with third parties that in the aggregate equate to 16 mtpa of LNG that commence with the date of first commercial delivery for Trains 1 through 4, which are fully permitted. In addition, Sabine Pass Liquefaction has entered into two fixed price, 20-year SPAs with third parties for another 3.75 mtpa of LNG that commence with the date of first commercial delivery for Train 5, which has not yet received regulatory approval for construction. Under the SPAs, the customers will purchase LNG from Sabine Pass Liquefaction for a price consisting of a fixed fee plus 115% of Henry Hub per MMBtu of LNG. In certain circumstances, the customers may elect to cancel or suspend deliveries of LNG cargoes, in which case the customers would still be required to pay the fixed fee with respect to cargoes that are not delivered. A portion of the fixed fee will be subject to annual adjustment for inflation. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA commences upon the start of operations of the specified Train.

In aggregate, the fixed fee portion to be paid by these customers is approximately $2.3 billion annually for Trains 1 through 4, and $2.9 billion annually if we make a positive final investment decision with respect to Train 5, with the applicable fixed fees starting from the commencement of commercial operations of the applicable Train. These fixed fees equal approximately $411 million, $564 million, $650 million, $648 million and $588 million for each of Trains 1 through 5, respectively.

In addition, Cheniere Marketing has entered into an SPA with Sabine Pass Liquefaction to purchase, at Cheniere Marketing's option, up to 104,000,000 MMBtu/yr of LNG. Sabine Pass Liquefaction has the right each year during the term of the SPA to reduce the annual contract quantity based on its assessment of how much LNG it can produce in excess of that required for other customers. Cheniere Marketing may purchase incremental LNG volumes at a price of 115% of Henry Hub plus up to $3.00 per MMBtu for the most profitable 36,000,000 MMBtu of cargoes sold each year by Cheniere Marketing, and then 20% of net profits of the remaining 68,000,000 MMBtu sold each year by Cheniere Marketing.

Natural Gas Transportation and Supply

For Sabine Pass Liquefaction's feed gas transportation requirements, Sabine Pass Liquefaction has entered into transportation precedent agreements to secure firm pipeline transportation capacity with CTPL and other third party pipeline companies. Sabine Pass Liquefaction has entered into enabling agreements with third parties, and will continue to enter into such agreements in order to secure feed gas for the Sabine Pass Liquefaction Project.

xvii

Construction

Trains 1 through 4 are being designed, constructed and commissioned by Bechtel Oil, Gas and Chemicals, Inc. ("Bechtel"). Sabine Pass Liquefaction entered into lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of Train 1 and Train 2 (the "EPC Contract (Trains 1 and 2)") and Train 3 and Train 4 (the "EPC Contract (Trains 3 and 4)") under which Bechtel charges a lump sum for all work performed and generally bears project cost risk unless certain specified events occur, in which case Bechtel may cause Sabine Pass Liquefaction to enter into a change order, or Sabine Pass Liquefaction agrees with Bechtel to a change order.

The total contract price of the EPC Contract (Trains 1 and 2) and the total contract price of the EPC Contract (Trains 3 and 4) are approximately $4.1 billion and $3.7 billion, respectively, reflecting amounts incurred under change orders through March 31, 2014. Total expected capital costs for Trains 1 through 4 are estimated to be between $9.0 billion and $10.0 billion before financing costs and between $12.0 billion and $13.0 billion after financing costs, including, in each case, estimated owner's costs and contingencies.

Pipeline Facilities

CTPL owns the Creole Trail Pipeline, a 94-mile pipeline interconnecting the Sabine Pass LNG terminal with a number of large interstate pipelines. In December 2013, CTPL began construction of certain modifications to allow the Creole Trail Pipeline to be able to transport natural gas to the Sabine Pass LNG terminal. Cheniere Partners estimates that the capital costs to modify the Creole Trail Pipeline will be approximately $100 million. The modifications are expected to be in service in time for the commissioning and testing of Trains 1 and 2.

Capital Resources

We currently expect that Sabine Pass Liquefaction's capital resources requirements with respect to Trains 1 through 4 of the Sabine Pass Liquefaction Project will be financed through one or more of the following: borrowings, equity contributions from Cheniere Partners and cash flows under the SPAs. We believe that with the net proceeds of borrowings, unfunded commitments under the 2013 Liquefaction Credit Facilities (as defined below) and cash flows from operations, we will have adequate financial resources available to complete Trains 1 through 4 of the Sabine Pass Liquefaction Project and to meet our currently anticipated capital, operating and debt service requirements. We currently project that Sabine Pass Liquefaction will generate cash flow by late 2015, when Train 1 of the Sabine Pass Liquefaction Project is anticipated to achieve initial LNG production.

Senior Secured Notes

As of March 31, 2014, subsidiaries of Cheniere Partners had five series of senior secured notes outstanding (collectively, the "Senior Notes"):
• $1.7 billion of 7.50% Senior Secured Notes due 2016 issued by Sabine Pass LNG (the "2016 Notes");

• $0.4 billion of 6.50% Senior Secured Notes due 2020 issued by Sabine Pass LNG (the "2020 Notes" and collectively with the 2016 Notes, the "Sabine Pass LNG Senior Notes");

• $2.0 billion of 5.625% Senior Secured Notes due 2021 (the "2021 Sabine Pass Liquefaction Senior Notes");

• $1.0 billion of 6.250% Senior Secured Notes due 2022 (the "2022 Sabine Pass Liquefaction Senior Notes"); and

• $1.0 billion of 5.625% Senior Secured Notes due 2023 (the "2023 Sabine Pass Liquefaction Senior Notes") (collectively with the 2021 Sabine Pass Liquefaction Senior Notes and the 2022 Sabine Pass Liquefaction Senior Notes, the "Sabine Pass Liquefaction Senior Notes").

Interest on the Senior Notes is payable semi-annually in arrears. Subject to permitted liens, the Sabine Pass LNG Senior Notes are secured on a pari passu first-priority basis by a security interest in all of Sabine Pass LNG's equity interests and substantially all of Sabine Pass LNG's operating assets. The Sabine Pass Liquefaction Senior Notes are secured on a first-priority basis by a security interest in all of the membership interests in Sabine Pass Liquefaction and substantially all of Sabine Pass Liquefaction's assets.

xviii

Sabine Pass LNG may redeem all or part of its 2016 Notes at any time at a redemption price equal to 100% of the principal plus any accrued and unpaid interest plus the greater of:
•1.0% of the principal amount of the 2016 Notes; or . . .

  Add LNG to Portfolio     Set Alert         Email to a Friend  
Get SEC Filings for Another Symbol: Symbol Lookup
Quotes & Info for LNG - All Recent SEC Filings
Copyright © 2014 Yahoo! Inc. All rights reserved. Privacy Policy - Terms of Service
SEC Filing data and information provided by EDGAR Online, Inc. (1-800-416-6651). All information provided "as is" for informational purposes only, not intended for trading purposes or advice. Neither Yahoo! nor any of independent providers is liable for any informational errors, incompleteness, or delays, or for any actions taken in reliance on information contained herein. By accessing the Yahoo! site, you agree not to redistribute the information found therein.