Item 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Statements we make in the following discussion, which express a belief, expectation or intention, as well as those that are not historical fact, are forward-looking statements that are subject to risks, uncertainties and assumptions. Our actual results, performance or achievements, or industry results, could differ materially from those we express in the following discussion as a result of a variety of factors, including the risks and uncertainties we have referred to under the headings "Cautionary Statement Concerning Forward-Looking Statements" and "Risk Factors" in Items 1 and 1A of Part I of this report.

GENERAL

In general, we operate in capital-intensive industries and rely on large contracts for a substantial amount of our revenues. We are currently exploring growth strategies across our segments through acquisitions to expand and complement our existing businesses. As we pursue these opportunities, we expect they would be funded by cash on hand, external financing, including debt, equity or some combination thereof.

We operate in four business segments: Power Generation, Nuclear Operations, Technical Services and Nuclear Energy. We were a wholly owned subsidiary of MII until July 30, 2010, when MII distributed 100% of our outstanding common stock to the MII shareholders. On and prior to July 30, 2010, our financial position, operating results and cash flows consisted of The Babcock & Wilcox Operations of MII, which represented a combined reporting entity comprised of the assets and liabilities involved in managing and operating the Power Generation Systems and Government Operations segments of MII in addition to two captive insurance companies which have been combined and contributed to B&W in conjunction with the spin-off of B&W by MII.

On July 2, 2010, MII's Board of Directors approved the spin-off of B&W through the distribution of shares of B&W common stock to holders of MII common stock. The distribution of B&W common stock was made on July 30, 2010, and consisted of one share of B&W common stock for every two shares of MII common stock to holders of MII common stock as of 5:00 p.m. New York City time on the record date, July 9, 2010. Cash was paid in lieu of any fractional shares of our common stock. As a result of the spin-off, we became a separate publicly traded company, and MII did not retain any ownership interest in us.

Outlook

Power Generation

We expect the backlog of our Power Generation segment of approximately $2.5 billion at December 31, 2012 to produce revenues of approximately $1.2 billion in 2013, not including any change orders or new contracts that may be awarded during the year. Through this segment, we are actively bidding on and, in some cases, beginning preliminary work on projects that we expect will be awarded to us in 2013 subject to successful contract negotiations. These projects are not currently reflected in backlog.

Our Power Generation segment's overall activity depends mainly on the capital expenditures of electric power generating companies and other steam-using industries. This segment's products and services are capital intensive and also dependent on expenditures by original equipment manufacturers. As such, customer demand is heavily affected by the variations in customers' business cycles, costs of fuel and by the overall economies of the countries in which they operate.

The Environmental Protection Agency ("EPA") issued proposed final environmental regulations concerning Mercury and Air Toxics Standards ("MATS") and rules concerning implementation of the Cross State Air Pollution Rule ("CSAPR") in 2011. On December 30, 2011 the Federal Court of Appeals for the DC Circuit (the "Court") stayed the CSAPR rules and reinstated EPA regulations from 2005. Oral arguments were held in April 2012. In August 2012, the Court ruled CSAPR, which set stricter limits on sulfur dioxide and nitrogen oxide emissions from power plants in 28 states, violated the Clean Air Act. The ruling leaves CSAPR's predecessor, the Clean Air Interstate Rule, in place. In October 2012, the EPA appealed the Court's decision. We believe it could take years for any regulatory response to develop in response to the Court's ruling.


Table of Contents

Uncertainty concerning environmental final rules and regulations could impact our Power Generation segment. For example, instead of adding environmental equipment, some of our customers may decide to close down their least efficient coal-fired boilers. Future decisions to retire boilers would impact our business in a variety of ways, including the servicing and retrofitting of operating power plants. The need to replace retired generating capacity with cleaner technologies would also create business opportunities for us. To generate energy while minimizing the emission of greenhouse gasses, we are actively researching and developing a range of products, including:

• non-carbon technologies, such as nuclear power plants and solar receivers for concentrating solar power plants;

• low-carbon technologies that enable clean use of fossil fuels, such as oxy-fuel combustion and regenerable solvent absorption technologies to scrub carbon dioxide from exhaust gases; and

• carbon-neutral technologies, such as biomass-fueled boilers and gasifiers, which use a renewable resource where the growing biomass re-absorbs the carbon dioxide emitted during energy production.

Changes and the uncertainties described above regarding the regulatory landscape, low natural gas prices and continued uncertainty in the economy have dampened somewhat the expected rate of growth of our environmental business within this segment. Utilities continue to operate coal-fired plants that require the environmental equipment and services that our Power Generation segment provides. However, we now expect that the timeframe over which such projects will be spread will be longer than our original timeframe of three to four years. We now expect the current environmental cycle to expand to a potentially six- or seven-year period, during which we anticipate a more competitive landscape in the near to medium term.

Nuclear Operations

We expect the backlog of our Nuclear Operations segment of approximately $3.0 billion at December 31, 2012 to produce revenues of approximately $1.1 billion in 2013, not including any change orders or new contracts that may be awarded during the year.

The revenues of our Nuclear Operations segment are largely a function of defense spending by the U.S. Government. As a supplier of major nuclear components for certain U.S. Government programs, we are a significant participant in the defense industry. In August 2011, Congress enacted the Budget Control Act of 2011, which committed the U.S. Government to significantly reducing the federal deficit over ten years. The Budget Control Act will likely constrain discretionary spending by the federal government for a number of years as it capped discretionary spending through 2021. It also established a Joint Committee of Congress to identify an additional $1.2 to $1.5 trillion in deficit reductions by November 23, 2011. The Joint Committee was unable to meet this deadline, triggering a provision, referred to as "sequestration", that calls for substantial automatic spending cuts split between defense and non-defense programs scheduled to start in March 2013 and continue over a nine-year period. Federal government spending reductions, including through sequestration, could adversely impact U.S. Government programs for which we provide products or services. There is currently no official planning guidance regarding how sequestration would be implemented, if it were to go into effect. As members of Congress and the Administration continue to discuss various options to prevent or defer sequestration, we cannot predict whether any such efforts will succeed. Additionally, while we believe many of our programs are well aligned with national defense and other strategic priorities, and we supply high-end equipment for submarines and aircraft carriers for the U.S. Navy, the outcome of efforts underway regarding sequestration is uncertain and it is possible that spending cuts may be applied to U.S. Government programs across the board, regardless of how programs align with those priorities. There are many variables in how the Budget Control Act could be implemented that will determine its specific impact; however, reductions in federal government spending and sequestration, as currently provided for under the Budget Control Act, could have a material adverse impact on the operating results and cash flows of our Nuclear Operations and Technical Services segments.

Technical Services

A significant portion of this segment's operations are conducted through joint ventures which typically earn fees and we account for them following the equity method of accounting. See Note 3 to our consolidated and combined financial statements included in this report for financial information on our equity method investments. As a result, this segment reports minimal backlog and revenues.


Table of Contents

With our specialized capabilities of full life-cycle management of special nuclear materials, facilities and technologies, our Technical Services segment is well-positioned to continue to participate in the continuing cleanup, operation and management of the nuclear sites and weapons complexes maintained by the DOE.

Contracts for two projects under B&W led management teams, Y-12 and Pantex, ended in 2010 but were extended while the National Nuclear Security Administration ("NNSA") conducted a contract re-compete process. In addition, the NNSA determined it would be advantageous to combine the management of Y-12 and Pantex into a single management contract. Proposals were submitted to the NNSA in March of 2012. In late July 2012, the Y-12 National Security Complex in Oak Ridge, Tennessee experienced a security breach. Nuclear operations at the site were temporarily ceased for approximately two weeks in early August 2012. All operations have now resumed. The Y-12 security force had been managed by another DOE prime contractor at the time of the incident. The security contract was assigned to our joint venture by the NNSA following the security breach. The contractor responsible for managing the security force at the time of the security breach was terminated and our joint venture took direct responsibility for security at the Y-12 National Security Complex. Following the security breach, a number of immediate changes and security enhancements were instituted, including the removal and replacement of key B&W leadership personnel, restoration of critical security system elements to service and refining and recalibrating of alarm system components to enhance reliability. The security breach adversely affected the fees earned in 2012 by our joint venture that manages and operates the site. After the security breach, the NNSA revised the request for proposal to include the security work scope into the new management contract. Bidders, including the B&W led joint venture, revised proposals in September of 2012. On January 8, 2013, we were notified that our joint venture was not selected to lead the NNSA's combined Management and Operating ("M&O") contract for the Y-12 National Security Complex and Pantex Plant. On January 18, 2013, our joint venture, NP2, filed a protest against NNSA's award of the M&O contract. We will continue to manage both facilities during the protest period. Once the protest has been resolved we will manage both facilities through the transition process, which is expected to take approximately four months once the transition is initiated.

This segment produced $59.7 million of operating income in 2012, a 15% decrease from 2011. We expect operating income attributable to this segment to be lower in 2013 based on the new ownership fee structure for the combined Y-12/Pantex contract, or the eventual loss of the contract resulting from an unsuccessful protest.

Nuclear Energy

We expect the backlog of our Nuclear Energy segment of approximately $278 million at December 31, 2012 to produce revenues of approximately $180 million in 2013, not including any change orders or new contracts that may be awarded during the year.

During 2012, this segment entered into an agreement with Energy Northwest to settle contract claims related to a project for the removal and replacement of the main plant condenser and related parts at Energy Northwest's Columbia Generating Station, resulting in the recognition of revenues totaling approximately $18.4 million.

We expect to continue our development of the B&W mPower™ reactor. The development, general and administrative and capital costs to develop and commercialize this technology will require a substantial amount of investment over a period of years, and the funding requirements may vary significantly from period to period. We intend to continue with our plan to seek third party funding and/or participation to pursue the development and commercialization of this technology, including potential funding from the DOE in the form of grants subject to successful negotiations concerning terms and conditions. We expect our spending on development of the B&W mPower™ reactor to be consistent in 2013 compared to 2012 levels, excluding any additional third party funding or grants.

In November 2012, our Nuclear Energy segment was selected as the winner of the DOE's competitively bid Small Modular Reactor ("SMR") Licensing Technical Support Program, and will receive funding that will support accelerated development of its B&W mPower™ SMR technology.


Table of Contents

CRITICAL ACCOUNTING POLICIES AND ESTIMATES

Our financial statements and accompanying notes are prepared in accordance with accounting principles generally accepted in the United States. Preparing financial statements requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses. These estimates and assumptions are affected by management's application of accounting policies. We believe the following are our most critical accounting policies that we apply in the preparation of our financial statements. These policies require our most difficult, subjective and complex judgments, often as a result of the need to make estimates of matters that are inherently uncertain.

Contracts and Revenue Recognition. We determine the appropriate accounting method for each of our long-term contracts before work on the project begins. We generally recognize contract revenues and related costs on a percentage-of-completion method for individual contracts or combinations of contracts under the guidelines of FASB Topic Revenue Recognition. The use of this method is based on our experience and history of being able to prepare reasonably dependable estimates of the cost to complete our projects. Under this method, we recognize estimated contract revenue and resulting income based on costs incurred to date as a percentage of total estimated costs. Certain costs may be excluded from the cost-to-cost method of measuring progress, such as significant costs for materials and major third-party subcontractors, if it appears that such exclusion would result in a more meaningful measurement of actual contract progress and resulting periodic allocation of income. Total estimated costs, and resulting contract income, are affected by changes in the expected cost of materials and labor, productivity, scheduling and other factors. Additionally, external factors such as weather, customer requirements and other factors outside of our control may affect the progress and estimated cost of a project's completion and, therefore, the timing of revenue and income recognition. We routinely review estimates related to our contracts, and revisions to profitability are reflected in the quarterly and annual earnings we report. In the years ended December 31, 2012, 2011 and 2010, we recognized net favorable changes in estimate related to long-term contracts accounted for on the percentage-of-completion basis that increased operating income by approximately $93.1 million, $33.1 million and $112.7 million respectively. The 2012 amount includes approximately $16.9 million of contract losses, net of claims, based on our estimate of costs to complete a project in our Power Generation segment. The 2011 amount includes approximately $61.8 million ($50.7 million in our Nuclear Energy segment and $11.1 in our Nuclear Operations segment) to complete certain projects attributable to unfavorable changes in estimate due to productivity and scheduling issues. The projects in 2011 are now complete.

For contracts as to which we are unable to estimate the final profitability except to assure that no loss will ultimately be incurred, we recognize equal amounts of revenue and cost until the final results can be estimated more precisely. For these deferred profit recognition contracts, we recognize revenue and cost equally and only recognize gross margin when probable and reasonably estimable, which we generally determine to be when the contract is approximately 70% complete. We treat long-term construction contracts that contain such a level of risk and uncertainty that estimation of the final outcome is impractical except to assure that no loss will be incurred as deferred profit recognition contracts.

Fixed-price contracts are required to be accounted for under the completed-contract method if we are unable to reasonably forecast cost to complete at start-up. For example, if we have no experience in performing the type of work on a particular project and were unable to develop reasonably dependable estimates of total costs to complete, we would follow the completed-contract method of accounting for such projects. Generally, our management's policy is not to enter into fixed-price contracts without an accurate estimate of cost to complete. However, it is possible that in the time between contract execution and the start of work on a project, we could lose confidence in our ability to forecast cost to complete based on intervening events, including, but not limited to, experience on similar projects, civil unrest, strikes and volatility in our expected costs. In such a situation, we would use the completed-contract method of accounting for that project. We did not enter into any contracts that we have accounted for under the completed-contract method during 2012, 2011 or 2010.

For the majority of parts orders and aftermarket services activities, we recognize revenues as goods are delivered and work is performed.

For all contracts, if a current estimate of total contract cost indicates a loss on a contract, the projected loss is recognized in full when determined.


Table of Contents

Although we continually strive to improve our ability to estimate our contract costs and profitability, adjustments to overall contract costs due to unforeseen events could be significant in future periods. We recognize claims for extra work or for changes in scope of work in contract revenues, to the extent of costs incurred, when we believe collection is probable and can be reasonably estimated. We recognize income from contract change orders or claims when formally agreed with the customer. We regularly assess the collectibility of contract revenues and receivables from customers.

Some of our contracts contain provisions that require us to pay liquidated damages if we are responsible for the failure to meet specified contractual milestone dates and the applicable customer asserts a claim under these provisions. These contracts define the conditions and timing under which our customers may make claims against us for liquidated damages. In the majority of cases in which we have had potential exposure for liquidated damages, such damages ultimately were determined not to be caused by our actions or were not otherwise asserted by our customers. Accordingly, we do not accrue liabilities for liquidated damages unless probable and estimable. As of December 31, 2012, we had not accrued for approximately $6.0 million of potential liquidated damages that are not currently due under the particular contract but which we believe could be asserted based upon our current expectations of the time to complete a certain project in our Power Generation segment. We do not believe any of these potential liquidated damages are probable of being assessed due primarily to their relationship to unforeseen worksite conditions that we believe are the responsibility of our customer. We are in active discussions with our customer on the issues giving rise to delays in this project, and we believe we will be successful in obtaining schedule extensions that should resolve the potential for liquidated damages liability. However, we may not achieve relief on some or all of the issues.

Property, Plant and Equipment. We carry our property, plant and equipment at depreciated cost, reduced by provisions to recognize economic impairment when we determine impairment has occurred. Property, plant and equipment amounts are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset, or asset group, may not be recoverable. An impairment loss would be recognized when the carrying amount of an asset exceeds the estimated undiscounted future cash flows expected to result from the use of the asset and its eventual disposition. The amount of the impairment loss to be recorded is calculated by the excess of the assets carrying value over its fair value. Fair value is generally determined using a discounted cash flow analysis. Our estimates of cash flow may differ from actual cash flow due to, among other things, technological changes, economic conditions or changes in operating performance. Any changes in such factors may negatively affect our business segments and result in future asset impairments.

We depreciate our property, plant and equipment using the straight-line method, over estimated economic useful lives of eight to 40 years for buildings and two to 28 years for machinery and equipment. We expense the costs of maintenance, repairs and renewals, which do not materially prolong the useful life of an asset, as we incur them.

Investments in Unconsolidated Affiliates. We use the equity method of accounting for affiliates in which our investment ownership ranges from 20% to 50%, unless significant economic or governance considerations indicate that we are unable to exert significant influence, in which case the cost method is used. The equity method is also used for affiliates in which our investment ownership is greater than 50% but we do not have a controlling interest. Currently, all of our material investments in affiliates that are not included in our consolidated results are recorded using the equity method. Affiliates in which our investment ownership is less than 20% and where we are unable to exert significant influence are carried at cost.

Self-Insurance. We have a wholly owned insurance subsidiary that provides employer's liability, general and automotive liability and workers' compensation insurance and, from time to time, builder's risk insurance within certain limits to our companies. We may also have business reasons in the future to have our insurance subsidiary accept other risks that we cannot or do not wish to transfer to outside insurance companies. When estimating our self-insurance liabilities, we consider a number of factors, including historical claims experience and trend lines, projected growth patterns, inflation and exposure forecasts. The assumptions we make with respect to each of these factors represent our judgment as to the most probable cumulative impact of each factor on our future obligations. Our calculation of self-insurance liabilities requires us to apply judgment to estimate the ultimate cost to settle reported claims and claims incurred but not yet reported as of the balance sheet date. We engage the services of an actuarial firm to assist us in the calculation of our liabilities for self-insurance. While the actual outcome of insured claims could differ significantly from estimated amounts, these loss estimates and accruals recorded in our financial statements for claims have historically been reasonable in light of the actual amount of claims paid. Provisions for


Table of Contents

exposure to self-insurance claims and the related payments of claims have historically not had a material adverse impact on our consolidated financial position, results of operations and cash flows, and we do not expect these provisions to have a material impact on our self-insurance programs in the future.

Pension Plans and Postretirement Benefits. We estimate income or expense related to our pension and postretirement benefit plans based on actuarial assumptions, including assumptions regarding discount rates and expected returns on plan assets. We determine our discount rate based on a review of published financial data and discussions with our actuary regarding rates of return on high-quality, fixed-income investments currently available and expected to be available during the period to maturity of our pension obligations. Based on historical data and discussions with our actuary, we determine our expected return on plan assets based on the expected long-term rate of return on our plan assets and the market-related value of our plan assets. Our pension plan assets can include assets that are difficult to value. Changes in these assumptions can result in significant changes in our estimated pension income or expense and our consolidated financial condition. We revise our assumptions on an annual basis based upon changes in current interest rates, return on plan assets and the underlying demographics of our workforce. These assumptions are reasonably likely to change in future periods and may have a material impact on future earnings.

In the fourth quarter of 2012, we elected to change our accounting method for recognizing actuarial gains and losses for our pension and other postretirement benefit plans. Historically, these gains and losses were recognized as a component of accumulated other comprehensive income on our consolidated balance sheets and we amortized these actuarial gains and losses into earnings over the average remaining service period of our Canadian plans to the extent such gains and losses exceeded a corridor and for our domestic plans we used an amortization method over the average remaining service period without the use of a corridor. Under our new accounting method, we will immediately recognize actuarial gains and losses into earnings in the fourth quarter each year as a component of net periodic benefit cost. This change in accounting will have no impact on the funding of our pension and other postretirement benefit plans or the Company's cash flow. This change has been reported through retrospective application of the new accounting method to all periods presented. See Note 6 to our consolidated and combined financial statements included in this report for information on our pension and postretirement benefit plans and Note 20 for disclosures relating to the effect of this change in our accounting method.

Loss Contingencies. We estimate liabilities for loss contingencies when it is probable that a liability has been incurred and the amount of loss is reasonably estimable. We provide disclosure when there is a reasonable possibility that the ultimate loss will exceed the recorded provision or if such probable loss is not reasonably estimable. We are currently involved in some significant litigation, as discussed in Note 10 to our consolidated and combined financial statements included in this report. We have accrued our estimates of the probable losses . . .

  Add BWC to Portfolio     Set Alert         Email to a Friend  
Get SEC Filings for Another Symbol: Symbol Lookup
Quotes & Info for BWC - All Recent SEC Filings
Sign Up for a Free Trial to the NEW EDGAR Online Pro
Detailed SEC, Financial, Ownership and Offering Data on over 12,000 U.S. Public Companies.
Actionable and easy-to-use with searching, alerting, downloading and more.
Request a Trial      Sign Up Now


Copyright © 2013 Yahoo! Inc. All rights reserved. Privacy Policy - Terms of Service
SEC Filing data and information provided by EDGAR Online, Inc. (1-800-416-6651). All information provided "as is" for informational purposes only, not intended for trading purposes or advice. Neither Yahoo! nor any of independent providers is liable for any informational errors, incompleteness, or delays, or for any actions taken in reliance on information contained herein. By accessing the Yahoo! site, you agree not to redistribute the information found therein.