ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Cautionary Note Regarding Forward-Looking Statements

This quarterly report on Form 10-Q includes "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical facts, included in this quarterly report that address activities, events or developments that we expect or anticipate will or may occur in the future, including such matters as our projections of annual revenues, expenses and debt service coverage with respect to our debt securities, future capital expenditures, business strategy, competitive strengths, goals, development or operation of generation assets, market and industry developments and the growth of our business and operations, are forward-looking statements. When used in this quarterly report on Form 10-Q, the words "may", "will", "could", "should", "expects", "plans", "anticipates", "believes", "estimates", "predicts", "projects", "potential", or "contemplate" or the negative of these terms or other comparable terminology are intended to identify forward-looking statements, although not all forward-looking statements contain such words or expressions. The forward-looking statements in this quarterly report are primarily located in the material set forth under the headings "Management's Discussion and Analysis of Financial Condition and Results of Operations", "Risk Factors", and "Notes to Condensed Consolidated Financial Statements", but are found in other locations as well. These forward-looking statements generally relate to our plans, objectives and expectations for future operations and are based upon management's current estimates and projections of future results or trends. Although we believe that our plans and objectives reflected in or suggested by these forward-looking statements are reasonable, we may not achieve these plans or objectives. You should read this quarterly report on Form 10-Q completely and with the understanding that actual future results and developments may be materially different from what we expect due to a number of risks and uncertainties, many of which are beyond our control. Other than as required by law, we will not update forward-looking statements even though our situation may change in the future.

Specific factors that might cause actual results to differ from our expectations include, but are not limited to:

significant considerations, risks and uncertainties discussed in this quarterly report;

operating risks, including equipment failures and the amounts and timing of revenues and expenses;

geothermal resource risk (such as the heat content, useful life and geological formation of the reservoir);

financial market conditions and the results of financing efforts;

the impact of fluctuations in oil and natural gas prices on the energy price component under certain of our power purchase agreements (PPAs);

environmental constraints on operations and environmental liabilities arising out of past or present operations, including the risk that we may not have, and in the future may be unable to procure, any necessary permits or other environmental authorizations;

construction or other project delays or cancellations;

political, legal, regulatory, governmental, administrative and economic conditions and developments in the United States and other countries in which we operate;

the enforceability of the long-term PPAs for our power plants;

contract counterparty risk;

weather and other natural phenomena;

the impact of recent and future federal and state regulatory proceedings and changes, including legislative and regulatory initiatives regarding deregulation and restructuring of the electric utility industry, public policies and government incentives that support renewable energy and enhance the economic feasibility of our projects at the federal and state level in the United States and elsewhere, and carbon-related legislation;


Table of Contents
changes in environmental and other laws and regulations to which our company is subject, as well as changes in the application of existing laws and regulations;

current and future litigation;

our ability to successfully identify, integrate and complete acquisitions;

competition from other existing geothermal energy projects and new geothermal energy projects developed in the future, as well as from alternative electricity producing technologies;

the effect of and changes in economic conditions in the areas in which we operate;

market or business conditions and fluctuations in demand for energy or capacity in the markets in which we operate;

the direct or indirect impact on our company's business resulting from the threat or occurrence of terrorist incidents or cyber-attacks or responses to such threatened or actual incidents or attacks, including the effect on the availability of and premiums on insurance;

the effect of and changes in current and future land use and zoning regulations, residential, commercial and industrial development and urbanization in the areas in which we operate;

development and construction of the solar photovoltaic (Solar PV) projects may not materialize as planned;

the risk factors set forth in our Annual Report on Form 10-K for the year ended December 31, 2011 and any update contained herein and other risks and uncertainties detailed from time to time in our filings with the Securities and Exchange Commission (SEC); and

other uncertainties which are difficult to predict or beyond our control and the risk that we incorrectly analyze these risks and forces or that the strategies we develop to address them could be unsuccessful.

Investors are cautioned that these forward-looking statements are inherently uncertain. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results or outcomes may vary materially from those described herein. Given these risks and uncertainties, readers are cautioned not to place undue reliance on such forward-looking statements.

General

The following discussion and analysis of our financial condition and results of operations should be read together with our condensed consolidated financial statements and related notes included elsewhere in this report. See also "Cautionary Note Regarding Forward-Looking Statements" above and Item 1A - "Risk Factors" below for a discussion of important factors that could cause actual results to differ materially from the results described herein or implied by such forward-looking statements.

Overview

We are a leading vertically integrated company engaged primarily in the geothermal and recovered energy power business. We design, develop, build, sell, own and operate clean, environmentally friendly geothermal and recovered energy-based power plants, in most cases using equipment that we design and manufacture.

Our geothermal power plants include both power plants that we have built and power plants that we have acquired, while all of our recovered energy-based plants have been constructed by us. We conduct our business activities in two business segments:

The Electricity Segment - in this segment, we develop, build, own and operate geothermal and recovered energy-based power plants in the United States and geothermal power plants in other countries around the world, and sell the electricity they generate. We have expanded our activities in the Electricity Segment to include the ownership and operation of power plants that produce electricity generated by Solar PV systems that we do not manufacture; and


Table of Contents
The Product Segment - in this segment we design, manufacture and sell equipment for geothermal and recovered energy-based electricity generation, remote power units and other power generating units and provide services relating to the engineering, procurement, construction, operation and maintenance of geothermal and recovered energy-based power plants.

Both our Electricity Segment and Product Segment operations are conducted in the United States and throughout the world. Our current generating portfolio includes geothermal power plants in the United States, Guatemala, Kenya, and Nicaragua, as well as recovered energy generation (REG) plants in the United States.

For the nine months ended September 30, 2012, our total revenues increased by 27.1% (from $313.3 million to $398.3 million) over the same period last year.

For the nine months ended September 30, 2012, total Electricity Segment revenues were $248.7 million, compared to $246.3 million for the nine months ended September 30, 2011, an increase of 1.0%, while Product Segment revenues were $149.6 million for the nine months ended September 30, 2012, compared to $67.0 million for the nine months ended September 30, 2011, an increase of 123.3%.

For the nine months ended September 30, 2012, our Electricity Segment revenues represented approximately 62.4% of our total revenues, while our Product Segment revenues represented approximately 37.6% of our total revenues. For the nine months ended September 30, 2011, our Electricity Segment revenues represented approximately 78.6% of our total revenues, while our Product Segment revenues represented approximately 21.4% of our total revenues. The increase in Product Segment revenues reflects the increase in new customer orders that we secured in 2011, particularly the $130.0 million order we received from Mighty River Power Limited for the Ngatamariki Geothermal Field in New Zealand, which project is underway in 2012 and is expected to be completed in 2013.

Revenues from our Electricity Segment are derived from sales of electricity generated by our power plants pursuant to long-term PPAs. We have variable price PPAs in California, Hawaii and Guatemala:

The energy rate under the PPAs in California for the Ormesa complex, the Mammoth complex, and the Heber 1 and Heber 2 power plants (the California SO#4 PPAs), changed in the beginning of May 2012, from a fixed to a variable rate that is subject to the impact of fluctuations in natural gas prices.

The prices paid for the electricity pursuant to the 25 megawatts (MW) PPA for the Puna complex in Hawaii are variable and based on the local utility's avoided cost, which is the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others. The prices, which are calculated on a monthly basis, are mainly impacted by the price of oil.

The energy price under the Amatitlan PPA in Guatemala is fixed, but we have the option to sell the power with advance notice to the spot market.

We have reduced our exposure to fluctuations in the price of natural gas and oil until December 31, 2013 by entering into derivative contracts, as described below under the heading "Recent Developments".

In the nine months ended September 30, 2012, approximately 79.9% of our Electricity Segment revenues were derived from PPAs with fixed energy rates, which are not affected by the fluctuations in energy commodity prices. Electricity Segment revenues are also subject to seasonal variations and can be affected by higher-than average ambient temperatures, as described below under the heading "Seasonality".

Revenues attributable to our Product Segment are based on the sale of equipment and the provision of various services to our customers. These revenues may vary from period to period because of the timing of our receipt of purchase orders and the progress of our execution of each project.

Our management assesses the performance of our two segments of operation differently. In the case of our Electricity Segment, when making decisions about potential acquisitions or the development of new projects, we


Table of Contents

typically focus on the internal rate of return of the relevant investment, relevant technical and geological matters and other relevant business considerations. We evaluate our operating power plants based on revenues and expenses, and our projects that are under development based on costs attributable to each such project. We evaluate the performance of our Product Segment based on the timely delivery of our products, performance quality of our products, and costs actually incurred to complete customer orders compared to the costs originally budgeted for such orders.

Recent Developments

The most significant recent developments in our company and business are described below.

Since the beginning of the year we entered into two new PPAs with Pacific Gas and Electric Company (PG&E) under the Renewable Auction Mechanism (RAM) program in California (discussed below under the heading "Trends and Uncertainties") to replace existing SO#4 PPAs:

We signed a 20-year PPA that was approved by the California Public Utilities Commission (CPUC), for the sale of up to 14 MW of energy to be produced from the G3 power plant in the Mammoth complex in California. Subject to final agreement with the current offtaker, Southern California Edison Company (Southern California Edison), we expect to start selling the electricity under the new PPA at the very end of 2012.

We signed a 20-year PPA for the sale of up to 7.5 MW of energy to be produced from the G1 power plant in the Mammoth complex in California. The PPA is subject to the approval of the CPUC and to final agreement with Southern California Edison. We expect to start selling the electricity under the new PPA toward the end of 2013.

Since April 2012, we have entered into several derivatives transactions to reduce our exposure to fluctuations in the price of natural gas and oil under our PPAs with Southern California Edison and under the 25 MW PPA for the Puna complex. These transactions have not been designated as hedge transactions and are marked to market with the corresponding gains or losses recognized within electricity revenues.

In October 2012, we entered into Natural Gas - California SoCal - NGI (NGI) swap contracts for settlement effective from January 1, 2013 until December 31, 2013. The swap contracts have monthly settlements whereby the difference between the NGI and fixed price of $4.00 per MMbtu will be settled on a cash basis. Under the terms of these contracts, we will make floating rate payments to the bank and receive fixed rate payments from the bank on each settlement date. These swap contracts fix the energy rates under the SO#4 PPAs. The capacity payments under these PPAs remain fixed.

In September 2012, we entered into European put transactions with two banks for settlement effective from January 1, 2013 until December 31, 2013, pursuant to which we purchased NYMEX Heating Oil and ICE Brent put options. We entered into these transactions because both options had a high correlation with the avoided costs that Hawaii Electric Light Company (HELCO) uses to calculate the energy rate for the 25 MW PPA for the Puna complex. Under these transactions, we will receive on each settlement date the difference between the strike price and the respective monthly average market price of the relevant commodity. If the strike price is lower than the monthly average market price, no payment will be made. These transactions ensure a minimum on-peak energy rate and the capacity payments under these PPAs remain fixed.

In July 2012, we entered into a European put transaction with a bank for settlement effective from August 1, 2012 until December 31, 2012, pursuant to which we purchased a natural gas put option for 0.7 million MMbtus that settles against NGI. We entered into this transaction in order to reduce our exposure to NGI below $3.19 per MMbtu under our California SO#4 PPAs with Southern California Edison. We paid an up-front premium of approximately $0.2 million that was recorded as a current asset and is marked to market on each balance sheet date. Under this


Table of Contents
transaction we will receive from the bank on each settlement date the difference between the strike price of $3.19 per MMbtu and the market price on the first commodity business day on which the relevant commodity reference price is published in the relevant calculation period (July 1, 2012 to December 1, 2012). If the strike price is lower than the market price, no payment will be made.

In May 2012, we entered into a European put transaction with a bank for settlement effective from July 1, 2012 until December 31, 2012, pursuant to which we purchased a natural gas put option for 4.4 million MMbtus that settles against NGI. We entered into this transaction in order to reduce our exposure to NGI below $3.08 per MMbtu under our California SO#4 PPAs with Southern California Edison. We paid an up-front premium of approximately $1.6 million that was recorded as a current asset and is marked to market on each balance sheet date. Under this transaction we will receive from the bank on each settlement date the difference between the strike price of $3.08 per MMbtu and the market price on the first commodity business day on which the relevant commodity reference price is published in the relevant calculation period (July 1, 2012 to December 1, 2012). If the strike price is lower than the market price, no payment will be made.

In April 2012, we entered into a NYMEX Heating Oil swap contract (85%) and an ICE Brent swap contract (15%) with a bank, each of which is effective from May 1, 2012 until March 31, 2013. We entered into these contracts because both swaps had a high correlation with the avoided costs that HELCO uses to calculate the energy rate for the 25 MW PPA for the Puna complex. Fuel prices in April 2012 were at historically high levels and we wanted to protect ourselves from a decrease in prices over the next twelve months. The contracts did not have up-front costs. Under the terms of these contracts, we will make floating rate payments to the bank and receive fixed rate payments from the bank on each settlement date. The swap contracts have monthly settlements whereby the difference between the fixed price and the monthly average price will be settled on a cash basis.

In the second and third quarters of 2012, we received approximately $119.2 million in cash grants from the U.S. Department of the Treasury (U.S. Treasury) under Section 1603 of the American Recovery and Reinvestment Act of 2009 (ARRA) for specified energy property in lieu of tax credits relating to the enhancement of our Puna geothermal complex, and to our Jersey Valley, Tuscarora and McGinness Hills geothermal power plants.

In September 2012, we entered into European put transactions with two banks for settlement effective from January 1, 2013 until December 31, 2013, pursuant to which we purchased NYMEX Heating Oil and ICE Brent put options to reduce the Company's exposure to fluctuations in the energy rate caused by fluctuations in oil prices under the 25 MW PPA for the Puna complex. We entered into these transactions because both options had a high correlation with the avoided costs that HELCO uses to calculate the energy rate. Under these transactions, we will receive on each settlement date the difference between the strike price and the respective monthly average market price of the relevant commodity. If the strike price is lower than the monthly average market price, no payment will be made. These transactions ensure a minimum on-peak energy rate of approximately $182 per MWh. The capacity payment under these PPAs remains fixed. These transactions have not been designated as hedge transactions and are marked to market with the corresponding gains or losses recognized within electricity revenues.

In August 2012, our indirect wholly owned subsidiary, OrPower 4, Inc. (OrPower 4), and the Overseas Private Investment Corporation (OPIC), an agency of the United States Government, signed a finance agreement for limited-recourse project financing (Finance Agreement) totaling up to $310 million for the Olkaria III geothermal power complex located in Naivasha, Kenya. The OPIC loan is comprised of up to three tranches. The first two tranches totaled up to $265 million, with a final maturity of approximately 18 years. The loan will be used to pay costs of the existing facility and fund construction and well field drilling for the expansion of the Olkaria III geothermal power complex which could generate up to 84 MW. The Finance Agreement also includes a standby tranche of up to $45 million in


Table of Contents
the event OrPower 4 elects to construct a further expansion of up to 16 MW. Disbursements of the OPIC loan are subject to fulfillment of customary conditions precedent for funding, which we expect will be satisfied before December 31, 2012.

In August 2012, NV Energy, Inc. (NV Energy) approved the commercial operation date of our 30 MW McGinness Hills power plant in Nevada and the full energy price under the PPA has been paid retroactive to July 1, 2012.

In July 2012, our wholly owned subsidiary, Ormat Nevada Inc. (Ormat Nevada), entered into a $61.4 million engineering, procurement and construction (EPC) contract with Enel Green Power North America (Enel). Under the terms of the EPC contract, we will provide two air-cooled Ormat Energy Converters at Enel's Cove Fort geothermal power plant project in southern Utah. Previously, on April 25, 2012, we entered into an interim agreement in the amount of $9.1 million to ensure timely completion of the project.

In May 2012, NV Energy approved the commercial operation date of our 18 MW Tuscarora power plant in Nevada, and the full energy price under the PPA has been paid retroactive to January 1, 2012.

In May 2012, Bronicki Investments Ltd. (Bronicki Investments), the controlling shareholder of our parent company, Ormat Industries Ltd. (Ormat Industries), completed the sale of part of its interest in Ormat Industries to FIMI ENRG Limited Partnership, a newly formed Israeli partnership, and FIMI ENRG, L.P., a newly formed Delaware partnership, both controlled by FIMI Opportunity IV (collectively, FIMI), whereby Bronicki Investments sold to FIMI approximately 11.7% of the issued and outstanding shares of Ormat Industries. Following consummation of the transaction, each of Bronicki Investments and FIMI now holds 22.499% of the issued and outstanding shares of Ormat Industries, and the parties collectively own 44.999% of the issued and outstanding shares of Ormat Industries. In addition, effective May 22, 2012, Gillon Beck, a senior partner in FIMI, was appointed as the chairman of our Board of Directors; Ami Boehm, David Granot and Robert E. Joyal were appointed to our Board; and Lucien Y. Bronicki (our former Chairman), Roger W. Gale and David Wagener (former members of our Board) resigned from their respective positions on our Board of Directors.

In February 2012, Geothermal Development Company (GDC), a company owned by the Government of Kenya, awarded our subsidiary the first well head power plant project in the Menengai geothermal field in Kenya on a Build-Own-Transfer basis. The award was the result of an international tender for the design, manufacturing, procurement, construction and commissioning of a 6 MW geothermal well head power plant. GDC will supply the steam for conversion to electricity by our power plant. The Menengai geothermal field is located on the outskirts of the town of Nakuru, about 110 miles west of Nairobi.

In January 2012, the Public Utilities Commission of Nevada (PUCN) approved the 20-year PPA that we signed in February 2011 with NV Energy to sell 30 MW from the Dixie Meadows geothermal project that we are developing in Churchill County, Nevada.

Trends and Uncertainties

The geothermal industry in the United States has historically experienced significant growth followed by a consolidation of owners and operators of geothermal power plants. During the 1990s, growth and development in the geothermal industry occurred primarily in foreign markets and only minimal growth and development occurred in the United States. Since 2001, there has been increased demand for energy generated from geothermal resources in the United States as costs for electricity generated from geothermal resources have become more competitive relative to fossil fuel generation. This has been partly due to increasing natural gas and oil prices during much of this period and, equally important, to newly enacted legislative and regulatory requirements and incentives, such as state renewable portfolio standards and federal tax credits. The ARRA further encourages the use of geothermal energy through production tax credits (PTCs) or investment tax credits (ITCs) as well as cash grants (which are discussed in more detail in the section entitled "Government Grants and


Table of Contents

Tax Benefits" below). In response, the geothermal industry in the United States has seen a wave of new entrants and, over the last several years, consolidation involving smaller developers. We see the increasing demand for energy generated from geothermal and other renewable resources in the United States and the further introduction of renewable portfolio standards as significant trends affecting our industry today and in the immediate future. Our operations and the trends that from time to time impact our operations are subject to market cycles.

Although other trends, factors and uncertainties may impact our operations and financial condition, including many that we do not or cannot foresee, we believe that our results of operations and financial condition for the foreseeable future will be affected by the following trends, factors and uncertainties:

We expect to continue to generate the majority of our revenues from our Electricity Segment through the sale of electricity from our power plants. Substantially all of our current revenues from the sale of electricity are derived from payments under long-term PPAs related to fully-contracted power plants. We also intend to continue to pursue opportunities, as they arise, in our recovered energy business and in the Solar PV sector.

Our primary focus continues to be our organic growth through exploration, development, and construction of new projects and enhancements of existing power plants. We expect that this investment in organic growth will increase our total generating capacity, consolidated revenues and operating income attributable to our Electricity Segment from year to year. In addition, we routinely look at acquisition opportunities.

The continued awareness of climate change may result in significant changes in the business and regulatory environments, which may create business opportunities for us. In 2011, the first phase of the U.S. Environmental Protection Agency's (EPA) "Tailoring Rule" took effect. The Tailoring Rule sets thresholds addressing the applicability of the permitting requirements under the Clean Air Act's Prevention of Significant Deterioration and Title V programs to certain major sources of greenhouse gas (GHG) emissions. Federal legislation or additional federal regulations addressing climate change are possible. Several states and regions are already addressing climate change. For example, California's state climate change law, AB 32, which was signed into law in September 2006, regulates most sources of GHG emissions and aims to reduce GHG emissions to 1990 levels by 2020. On October 20, 2011 the California Air Resources Board (CARB) adopted cap-and-trade regulations to reduce . . .

  Add ORA to Portfolio     Set Alert         Email to a Friend  
Get SEC Filings for Another Symbol: Symbol Lookup
Quotes & Info for ORA - All Recent SEC Filings
Copyright © 2014 Yahoo! Inc. All rights reserved. Privacy Policy - Terms of Service
SEC Filing data and information provided by EDGAR Online, Inc. (1-800-416-6651). All information provided "as is" for informational purposes only, not intended for trading purposes or advice. Neither Yahoo! nor any of independent providers is liable for any informational errors, incompleteness, or delays, or for any actions taken in reliance on information contained herein. By accessing the Yahoo! site, you agree not to redistribute the information found therein.