|
Quotes & Info
|
| ITC > SEC Filings for ITC > Form 8-K on 4-Sep-2012 | All Recent SEC Filings |
4-Sep-2012
Other Events
On August 31, 2012, International Transmission Company's ("ITCTransmission") projected network rate of $2.147 per kW/month, Michigan Electric Transmission Company, LLC's ("METC") projected network rate of $2.5263 per kW/month, and ITC Midwest LLC's ("ITC Midwest") projected network rate of $7.805 per kW/ month (which reflects a $4.125 million rate discount), for the period from January 1, 2013 through December 31, 2013, were posted by the Midwest Independent Transmission System Operator, Inc. The rates are based on ITCTransmission's, METC's, and ITC Midwest's Attachment O rate formulae using each company's respective projected net revenue requirement and load, in accordance with the Federal Energy Regulatory Commission's approvals in Docket Nos. ER06-1006, ER07-95, and ER07-887, for ITCTransmission, METC, and ITC Midwest, respectively.
The rate information can be accessed on the Internet at http://oasis.midwestiso.org/oasis/ITC for ITCTransmission, http://oasis.midwestiso.org/oasis/METC for METC, and http://oasis.midwestiso.org/oasis/ITCM for ITC Midwest.
Also on August 31, 2012, ITC Great Plains, LLC's ("ITC Great Plains") projected revenue requirement of $44,150,946 for the period January 1, 2013 through December 31, 2013 was posted by the Southwest Power Pool ("SPP"). The projected revenue requirement is based on ITC Great Plains' formula rate under SPP's Open Access Transmission Tariff, in accordance with the Federal Energy Regulatory Commission's approval in Docket No. ER09-548.
The ITC Great Plains' projected revenue requirements by project can be accessed
on the Internet at
http://sppoasis.spp.org/documents/SWPP/MemberRelatedPostings/MemberRelatedPostings.asp.
|
|